Invoices for air monitoring, Trinity Place project, 2002

Machine-extracted title · confidence 42%

Invoicing records for air monitoring/analysis services at 90/100 Trinity Place, July 2002.

NYC-WTC_000340187
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90 /100 TRINITY PLACE INVOICES

as of July 9, 2002

Contractor Billing I.D. Amount Scope EEMAPW

Submitted to Date Albert Kung_________ $ 9.616.00 90 panels analysis NYU-003

Albert Kung______ 2 s 8,923.20 90 panels and bridging analysis NYU-003

ATC Associates, Inc. 182,768.60 90 air monitoring/analysis through 2/02 NYU-004

ATC Associates. Inc. 2 87.215.20 100 air monitoring/analysis through 2/02 NYU-004

ATC Associates, Inc. $ 279,817.25 100 air monitoring/analysis 3/02 & 4/02 291,748.75 90 air monitoring/analysis 3/02& 4/02 ATC Associates, Inc. S A ATC Associates, inc. $ 11 273,171 00 90 air monitoring/analysis 5/02 & 6/02 ATC Associates, Inc. 13 259,440 00 100 air mon toring/analysis 5/02& 6/02 Athenica____________ $ 118 7,47200 100 QCair monitoring

Athenlca____________ 11® $ 3,844.00 90 DC air monitoring AWL Industries, Ire. 16 $ 111,55323 100 HVAC rehab AWl. Industries, Inc. $ 95,929 86 90 HVAC rehab NYU-002- $165,389.10 90/100 custodial labor/cleaning disallowed Board of Education Custodian ______ PO-I 1 253,291 72 Burns and Roe 2, 3, 4, 5,6,7 $ 34.415.93 90 and 100 Trinity HVAC engineenng Business Relocation Services _____ 12452 s 4,583.57 100 move-in Business Relocation Services 12454 $ 5,633.03 90 move-in Business Relocation Services 23252 $ 5,079.11 100 rr.ove-in Corinthian 1149 £ 49,000.00 100 air shaft return cleaning/reinsulation NYU-CO 2

Corinthian___________________ ______ 115Q 2.867.23 130 secondary cleaning lower aud. roof NYU-001 Doriel Scaffolding _______ 107 $ 4,500.00 90 plywood wall to close sidewalk tor probes NYU-003

DSF (work order)____________ 00024866-C3 1 114.53 100 control valves hot water system DSF (work order) 00024866-04 $ 509.63 100 chill water valve riRP (wArV Ardorl 00052472-01 1 71921 100 public address system DSF (work order) 73613 $ 2.112.35 100 plumbing in 12th floor bathroom DSF (work order) 00090363-01 7.000.00 90/100 plumbing repairs DSF (work order) 00092514-08 3,291.58 90/100 glass in walkway NYU-003- $1,009.14 DSr (work order) 00093067-01 $ 1,886 00 10C locks disallowed DSF (work order) 00093074-01 18,-44.32 100 tocks, doors, door checks DSF (work order) 00093195-01 $ 4,932.29 100 door glass / metal sash windows DSF (work order) 00093200-01 $ 1,690.19 90 glass main entrance doors DSF (work order) 00093200-03 s 1,571.01 90 doors, wood floor in gymnasium NYU-003- S4.399.e3 DSF (work order) 00093200-04 $ 4,619.47 90fre hatch at stairway disallowed DSF (work order)_____________ 00093322-01 $ 518.83 90 interior glazing DSF (work order)_____________ 00093322-02 $ 1,432.21 93 door checks replacement DSF (work order) 00093322-03 5 12.24 90 repair locks NYU-003 DSF (work order for Simplex) 00101279-01 S 25,647.90 100 repair fire alarm system Kiss Construction_____________ 19 514,561.23 90 interior cleaning NYU-004 Kiss Construction_____________ 29 $ 1,084,326.82 100 interior cleaning NYU-004 KW Tech 03-1001/#1 32,610.00 100 ductwork insulation replacement NYU-002 KW Tech 03-1001/#2 A 5.076.00 100 additional ductwork insulation disallowed? L. Naro 0O17J-0O$ -8,187.41 90 glass in lobby National Environmental Safety 37Q4-2001-tf1 $ 198,691.00 90 exterior cleaning NYU-001 National Environmental Safety 3705-2001-#1 $ 204,800.00 100 exterior cleaning NYU-001 Na nmenta' Safety National Environments; Safety 3705-2001-#2 i 1-#1 $ 3704/5-200 51,200.00 28,175.00 100 exterior cleaning 90/100 sidewalk bridging NYU-001 NYU-001 National Environmental Safety 3704/5-2001-#2 $ 10,225.00 90/100 sidewalk bridging NYU-001 National Environmental Safety 3704/5-2001-#1R s 1,481.22 90/100 sidewalk bridging IS-day rental NYU-001 Safway Steel Products DC055356 $ 82,252 50 90 sidewalk bridge (for panels) (75% billed) NYU-003 Stance Electric 2041 $ 1.031.58 90 bridge lighting NYU-0U3 Stanco Electric 2049 $ 717.16 100 restore functioning of exhaust fans 9th floor Stanco Electric_______________ 2060 A 1.116.40 100 restore functioning of fan shutdown relays Stanco Electric 2073 $ 632.45 103 bridge lighting NYU-003 Stanco Electric 2074 s 903.96 1C0 bridge Itg. trouble-shoot breakers remedy NYU-003 Stanco Electric 2039 s 596.52 90 bridge lighting NYU-003 Stanco Electric 2099 $ 347.82 100 bridge lighting NYU-003 Stanco Electric 2128 $ 608.18 90 bridge lighting NYU-003 __________ 2137 $ 47-.02 100 bridge lighting emergency response NYU 003 Taylor Environmental 129 $ 30,928.00 90 air sampling NYU-004 Taylor Enviror.mental 132 $ 32,465.00 100 air sampling NYU-004 Taylor Environmental 139 $ 43,373.00 100 air sampling NYU-004 149,167, 176, 102, 90/100 CM services TDX 199,207, 226 $ 152,943 25 (fee, general conditions, personnel) Tno Asbestos 22 S 666,346.07 100 interior clean-up NyU-004 V&F? Mechanical 1 S 420,000.00 100 HVAC duct cleaning NYU-0O2 V&R Mechanical 8 (change order) S 1,500.00 100 damaged ductwork at 6th floor NYU-Q02 V&R Mechanical IB (change order) $ 366.00 100 fresh air intake grille coverings/filters NYU-002 V&R Mechanical 19 (change order) $ 5,049.00 100 clean mixing boxes after new dampers NYU-002 V&R Mechanical 20 (change order) S 1,530.00 100 clean mixing boxes (plenums) NYU-002 100 reclean floors 3,5,7,9.10, basement; inspect V&R Mechanical 56 (change order) $ 205,710.00 HVAC entire buildmg, elc NYU-D02 V&R Mechanical 11581 $ 398,000.00 90 HVAC duct cleaning NYU-002 NYU-002- 570,500 V&R Mechanical 1 (Change orders) $ 16,250.00 90 clean mech. rocm / replace metal flex disallowed Warren & Panzer Engineering 138 $ 3.950.00 asbestos monitoring @ 90 Trinity NYU-004

TOTAL $ 6,264,897.03

90/100 CM services TDX TBD $ 22,659.68 (fee, general conditions, personnel) Safeway Stee' TBD 27,417.50 90 sidewalk bridge (for panels) (25% unbilled) Urban D C. Inc. 6681 $ 227,983.2.5 90 panels repair (21 panels) NYU-003

TOTAL $ 278,060.43 GRAND TOTAL I 5 6,542.95T^

CITY_2lMC100_009279337

NYC-WTC_000340187

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340187Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000340186

Invoices for NYC Board of Education services and materials, 90/100 Trinity.

Similar indexed content

Compare copies and versions →