Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
j
Area [Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/task (mins) Total Fiber OSHAPCM
count
(Obvious pon-
asbestos fibers
excluded)
[lOlKDOl] P 300 0.0220 ND
1
Tishman/Waldorf
West & Park Place by
Nynex bldg
Truck driver -empty
debris from
dumpster/drove debris
to landfill
[101KD02] P 296 0.0600 ND
AMEC
WTC#1 rubblepile &
West St
I
Gopher- set up/take
down weld rig
334 0.0400
I
[lOOlMLOl] P 0.1200
Weeks Marine.-Pier
25-26
I
Dock builder-direct
traffic while debris
dump/load onto barge
[1001ML03] P 432 0.0490 ND
Weeks Marine
Pier 25-26
Dock Builder- direct
traffic when steel is
dump/load onto barge
Page 33 of 65
3
CITY_21MC100_007222390
NYC-WTC_000339885
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339885Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.