Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
10/1 WTG OSHA ASBESTOS SAMPLINGDATA
I Permissible Exposure Limit (PEL): 0.1 fiber/cubic centimeter as an 8-hr Time
weighted average.
Excursion Limit; 1 fiber/cubic centimeter over a 30minute period.
Area [Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/task Type (mins) Total Fiber OSHAPCM
count
fObvious non
asbestos fibers
excluded)
[lOlMGOOl] P 316 0.0520 ND
AMEC I
WTC#1 -Iron worker -
in Manbasket over
WTC#1
[101MG002] p 316 0.055 ND
AMEC
WTC#1- Ironworker
work betw. Tool crib
and edge of the pile
[lOlDBlOl] P 203 NA NA
AMEC not analy
WTC#1 - Ironworker hi level
suspend in manbasket, dust
cutting beams with
torch, approx 10-20'
above ground
[101DB102] P 182 NA NA
AMEC not analy
WTC#1 - Ironworker hi level
suspend in manbasket, dust
cutting beams with
torch, approx 10-20'
above ground
Page 32 of 65
CITY_21MC100_007222389
NYC-WTC_000339884
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339884Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.