Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Area [Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/task Type (mins) Total Fiber OSHAPCM
count
(Obvious non
asbestos fibers
excluded)
[1001KH12] A 180 0.0300 ND
Koch-WTC#1-SW
side of rubble pile.lron
worker in manbasket
work intermittantly
(light rain)
[lOOlKHll] A 270 0.0180 ND
NYFD- westofWTC I
complex 50yds west of I
pile (light rain)
t
[lOOlLLl] A 275 0.0150 ND
AMEX bldg-NE side
ofP^fl
[1001LL2] A 303 0,0380 0.0060
AMEX bldg-
in shack
fl-sign
i
I
[lOlOlTGl] A 372 0.0180 ND
Amex Bldg - fleast I
side (face West st) on
stairway inside door
I
[10101TG2] A 350 0.0090 ND ■
Amex Bldg 2“* Fl
North side (facing ' I
Vesey St)-top of stairs
[10101TG3] A 369 0.0100 ND
Amex Bldg-1st Fl
North side (facing
Vesey St)
Page 34 of 65
i
CITY_21MC100_007222391
NYC-WTC_000339886
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339886Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.