City of New York Department of Design and Construction
Memorandum
TO: Robert Adams, Program Director, EHSS
FROM: Clifton Oates, Project Director, EHSS
DATE: 03-29-01
SUBJECT: WTC Asbestos Abatement Work
I have prepared a brief overview of my observations made during yesterday’s visit to WTC. I met with
Fred Burkhardt of ATC who gave me a summary of events and allowed me to review the existing
paperwork (i.e. notifications, air sample results, bulk sample results). I was subsequently escorted
through the premises by Fred and Victor Hillman of Liberty Mutual. Please review the following
comments;
• Abatement work inside of the Path tunnels located underneath Bldg. No. 6 and the northern
perimeter of the slurry wall has been completed. Abatement involved the removal of asbestos
containing transite wrap located around conduit embedded inside concrete. This conduit rims
parallel to the Path rail line. Abatement was conducted relevant to the recovery and debris
removal activities. Currently, no more abatement work is slated to take place inside of those
tunnels, according to Bovis. This is obviously subject to change. In addition, those Path
tunnels cannot be entered into at this time due to the area being designated as structurally
unsound.
• Abatement work has essentially been completed just east of the east slurry wall, where the Path
escalators were previously present and have been removed. The materials removed were
transite panels embedded inside the lining of the escalators. What was previously a muddy
mixture of water and transite material inside of the escalator pit has removed. The muddy
water has been pumped out and stored and will undergo testing for ACM’s. The sediment has
been manually removed and disposed of as ACM waste. Abatement handlers were in the
process of removing the collection of remaining bags during my visit.
• The debris pile located at the site of the Path escalators will have to be sorted for ACM’s. This
work will have to be coordinated with FDNY recovery efforts to take place on that debris pile.
This matter is currently in the process of negotiation.