Draft memo regarding PT&L environmental services' role and evaluation of submissions related to site monitoring.

NYC-WTC_000339674–000339680
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

THACHER ASSOCIATES Contract Issues

a) Through interviews with Seasons Contracting and PT&L, TA learned that there was no written contract, agreement or directive defining the Scope of Work.

b) The materials TA reviewed do not contain sampling schedules, directives, requests for services, Scope of Services or any other information indicating internal or external controls on service requirements. Without defined project directives or procedures, TA cannot ascertain whether proper control of the monitoring by PT&L at the site was ever performed by Seasons.

Integrity Issues

a) PT&L, through its sub-contractor (Omega Laboratories), generated field data forms which appear to be fabricated. TA’s analysis of the field data forms identified numerous discrepancies in the documentation provided.

b) TA, through an interview with PT&L, was told that the Omega Laboratories bill was resubmitted in the amount of $53,375.26. TA subsequently reviewed the revised Seasons Contracting/PT&L billings and did not find this reduction in the Omega Laboratories portion of the revised bill.

c) TA’s findings also indicate that, on numerous occasions, proper Chain-of-Custody procedures were not followed. Examples include missing or incomplete information in the Chain-of-Custody section of the field data forms. i d) Field data forms for bulk samples were submitted with indications of “field blanks.” There are no field blanks required with any bulk sample procedure.

Billing issues

a) TA identified excessive billing by PT&L through their sub-contractor. Omega Laboratories. This excessive billing was a result of Omega Laboratories utilizing twice the number of technical field personnel to perform the sampling function. The potential overcharge of the project overstaffing is $53,400.00.

b) TA identified over billing by PT&L for its sub-contractors, Omega Laboratories, Eastern Analytical Services, Galson Laboratories, JLC Environmental Consultants and USX Engineers & Consultants, Inc. This over billing was a result of PT&L charging overhead and profit at a rate of 21%, billing the sub-contractors as materials, as opposed to 5% as “other tier” contractors. The potential overcharge is $23,585.01

c) Excessive field blanks and lot blanks were submitted to inflate the cost of laboratory ■ analytical services. Due to the volume of material and discrepancies identified within support documentation provided, TA is of the opinion that cost savings analysis is cost prohibitive. 3

CITY_21MC100_003260697

NYC-WTC_000339676

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339676Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →