NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗General exceptions regarding utilities relocation and backfill responsibilities in street work.
NYC-WTC_000339431
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GENERAL EXCEPTIONS: RE: ALL WORK REQUIRING STREET EXCAVATIONS.
Due to the possibility of underground utilities, existing water mains, pipe lines, fiber optic cables, telephone lines, relocation & replacement of existing gas mains, conduit ducts, rock excavation, dewatering removal of existing soil determined " NO T SUITABLE FOR BACKFILL" by the NYCDOT or NYCDEP and furnishing suitable soil, contaminated soil removal & disposal, etc., we hereby take exception to and accept absolutely no responsibility for the cost of relocating these utilitie: and performing any additional work in order to perform the installation required by our contract. We will however, cooperate in every way with the governing utility to negotiate an amicable means for the: utilities to be relocated by their forces, or by our forces subsequent to an agreed change order in writing prior to beginning any additional work.
Dewatering and rock excavation if required is not included in this proposal and if required will be performed by our forces and paid for on a time and materials basis or another method acceptable to both parties.
In the event a change order is required and can not be negotiated at the time it is discovered and we an required to close up any excavations, there will be an additional charge for remobilization of our forces when an agreed change order has been signed both part ies. Please be aware the job will not continue until the additional work authorization is signed.
Contractor: JCC CONSTRUCTION CORPORATION Contractor Signature: Uavia CanmzzarO Print Name & Title: David Cannizzaro/President Date:
Agreed & Accepted by: Print Name & Title; Date:
CITY_21MC100_003259827
NYC-WTC_000339431
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
1 shared topics · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356980
Bid to perform materials and labor for listed World Trade Center works.
1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267052
JCC Construction Corp. proposal to perform specified site work for World Trade Center Recovery.
1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251953
Alternate proposal for WTC Recovery including sand removal and site improvements.
1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000205169
Proposal from JCC Construction Corp to remove and replace sand in the World Trade Center recovery site playground area dated May 2002.
1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388930
Proposed scope of maintenance work at World Trade Center site areas, including playgrounds, courts, railing, and roadway.
1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000251947
Proposal detailing tasks for WTC Recovery including soil, sand removal, and railing repairs.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281321
Proposal to furnish materials and labor for site work at World Trade Center recovery.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388927
Formal project scope and scope items for WTC Recovery works by JCC Construction.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280179
Project scope for restoration tasks at World Trade Center site, including sand replacement and railing work.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251953
Alternate proposal for WTC Recovery including sand removal and site improvements.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356811
Proposal to perform site work: sand, soil, railing, and roadway work at WTC site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000432245
Notices of exceptions and responsibility limits for utility work.
Similar indexed content
NYC-WTC_000432244
Contractor notes on utilities relocation and backfill obligations.
Similar indexed content
NYC-WTC_000356979
Contractor adopts no responsibility for utility relocation costs; notes conditions.
Similar indexed content
NYC-WTC_000182199
Contractual document outlining exceptions and additional costs for street excavations involving underground utilities.
Similar indexed content
NYC-WTC_000267329
General exceptions and scope exclusions for street excavations and utilities coordination.
Similar indexed content