NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 6 pages

ICS 201 summary, WTC site monitoring, Mar 2002

Machine-extracted title · confidence 43%

ICS 201 updated 3/22/02 for period 3/16–3/22/02 at WTC site.

NYC-WTC_000337723–000337728
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ICS 201 Summary of Current Actions Updated as of 1600, 3/22/02

0 DISPOSAL (TOUIP)

Auxiliary Chiller Room Oil Tanks - On 3/14, excavation reached the auxiliary chiller room, however, tie-back operations in that portion of the site delayed removal of the chiller units during the week of 3/17. Current projections call for removal of the chillers over the upcoming weekend, and Bovis indicated to EPA that the two 2500 gallon oil storage tanks located in that area should be exposed for pump-out sometime during the week of 3/24. The tanks each appear to be about half full, and their containment areas also contain oil.

WTC4 Oil Spill - On 3/11, a grappler working in the remains of WTC #4 punctured a 500 gallon diesel oil tank, releasing about half its contents into the surrounding ' excavation. ERRS continued to collect and replace oiled sorbent throughout the week of 3/17. NYSDEC has informed EPA that they do not want the oil-contaminated soil to go to the Fresh Kills landfill, so EPA has sampled the soil for disposal analysis. The contaminated soil will be segregated to the extent possible, and staged for examination by recovery personnel. Once the contaminated soil has been screened, it will be loaded in roll-offs for proper disposal.

B-6 Level Emergency Generators - Debris removal in the area surrounding the three remaining generators continued slowly during the week of 3/18. Tully, one of the prime contractors on site, will provide personnel to drain the oil from the generators before they are removed. EPA will oversee the work, to provide absorbent materials, technical assistance and support to address any oils that may spill during the recovery process.

B-6 10,000 Gallon Oil Storage Tank - On 3/21, EPA was notified by Bovis that an oil tank-estimated to be 500 gallons - had been uncovered during the previous night’s excavation. EPA and NYSDEC inspected the tank, and detennined that it was actually the 10,000 gallon tank that appeared on facility blueprints, but not in NYSDEC’s bulk storage tank registrations. ERRS mobilized its vac truck subcontractor, and removed approximately 6000 gallons of diesel oil. According to a NYSDEC tank registration, there may still be a 1080 gallon tank remaining in the vicinity of the generator roorh.

Stillwell & Gladding Laboratory, 130 Cedar Street - ERRS has completed the overpacking of the majority of the materials in the 8'*^ floor laboratory into containers and drums. As of 3/22, elevator service has yet to be restored to the building. EPA is trying to contact the building owner to determine when service will be restored, which will facilitate the removal of the materials from the building for disposal.

General Activities - EPA has repeatedly asked the Port Authority to notify us when it is possible to re-enter the B3 and B4 levels along the eastern portion of the site, where a previous entry identified the presence of cylinders and chemical containers. EPA will continue to pursue this issue with the PA, in order to remove those materials.

ICS 201

CITY_21MC100_002462789

NYC-WTC_000337724

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000337724Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

ICS 201 summary, Mar 22 2002

NYC-WTC_000303135

ICS 201 summary for period 3/16–3/22/02, NYC-WTC file CITY_21MC100_009041344.

Similar indexed content