WTC Daily Site Evaluation summary, Oct 24, 2001

Machine-extracted title · confidence 41%

Daily evaluation with items on gas cylinders, scaffolding, fall protection and PPE, open/Open status.

NYC-WTC_000337372–000337373
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Health WTC Daily Site Evaluation* 10/24/01

Major Issues Location Disposition Status Inadequate scaffolding.________________________________________ Winter garden________ Issue corrected by Breezes foreman.______________________________ NEW Gas cylinders improperly secured.________________________________ Winter garden________ Issue corrected by AMEC safety rep._____________________________ NEW Lack of fall protection._________________________________________ Between Plaza & WTC 6 Issue corrected by AMEC safety rep. NEW Inconsistent use of proper PPE (e.g., safety glasses, respiratory protection). WTC 1 Discussed with AMEC safety rep. OPEN Crane was backed off the pads; DDC & structural engineers are inspecting Crack observed in slurry wall. OPEN the area to determine the stability of the wall.

a Gas cylinders improperly secured and stored. Inadequate fall protection, (employees not wearing safetyliJniL n'^ ' * Inadequate dust suppression. Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory | WTC 2 WTC 3 WTC 2 WTC2 Discussed with Bovis safety rep. Discussed with Koch superintendent and Bovis safety rep. Bovis Safety is working with FDNY to correct. Conditions have improved. Met with Bovis safety rep. to discuss corrective action plan. NEW NEW OPEN OPEN protection). Inadequate barricading. WTC 2 South side Discussed with Bovis safety rep. OPEN

Discussed with Tully safety rep., NYPD (Capt. Motte), and Customs agent Discovery of ammunition on pile. Southeast comer of WTC 6 (Victoria Ovis). Tully will not cut in that area but will use grappler as OPEN directed by NYPD & Customs (Ordinance experts). Inadequate vehicle spotting. WTC2&4 Discussed with Tully safety rep. OPEN Truck made sharp turn and hit Tully gator that had FDNY sitting in it. Liberty Tully safety rep informed and incident report requested by Bechtlel Safety. OPEN Tully ordered flash arrestors and will place them on torch once they come Lack of flash arrestors on cutting torches. Various locations OPEN in. Gas cylinders improperly stored. Various locations Contractor’s safety rep. was informed. OPEN Inconsistent use of proper PPE (e.g., safety glasses, respirators). All areas Discussed with contractor’s safety personnel._______________________ OPEN Inadequate dust suppression. Tully Discussed with Tully safety rep. Conditions have improved. OPEN

Received demo, plan for 30 W. Broadway. WTC 7 Bechtel safety is reviewing. NEW WTC 7 (stacked Conex Inadequate fall protection. Discussed with Seasons safety rep. OPEN boxes) Backup alarm not loud enough on CAT front end loader 960F. WTC 7 Discussed with Seasons safety rep. OPEN Inadequate barriers by tube trailer.______________________ WTC 7 Turner Safety rep is working w/FDNY to correct.______________ OPEN No backup alarm on Seasons dump truck #38. (NJAF179H) WTC 7 Discussed with Seasons safety rep._________________________ OPEN Various locations Turner ordered flash arrestors and installed. 1 burner removed flash Lack of flash arrestors on cutting torches. OPEN arrestor. Discussed with Turner safety rep. Diesel fuel tanks not grounded or posted. Barclay St. Electrical cords were discovered to be cut. OPEN Gas cylinders improperly secured and stored.______________________ WTC 7 Met with Seasons safety rep, to discuss corrective action plan. OPEN Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 Met with Seasons safety rep. to discuss corrective action plan. OPEN o

s o o o I o o CT)

cn to, ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and conect any major unsafe practices and unsafe conditions. '.C o o

NYC-WTC_000337372

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000337372Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

11 shared non-person entities · 1 shared topics · similarity 0.982

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000302128

Daily site safety evaluation noting issues and corrective actions at WTC site.

Similar indexed content

NYC-WTC_000337370

Daily site evaluation entries noting PPE and fall protection issues and corrective actions.

Similar indexed content

NYC-WTC_000387709

Daily safety evaluation noting equipment, fall protection, and PPE issues at WTC site.

Similar indexed content