NYC 9/11 Public Portal Document
2. The authority to stop work for non-compliance with the Scope of Work.
3. The authority to give technical direction to the contractor in the performance of the work.
4. The authority to review and approve or disapprove of the qualifications of the cleaning
personnel involved in the work.
5. The right to inspect and accept or reject any work .
C. Qualifications
Proof of qualifications must be presented upon request, i «q
sampling, personal monitoring and HVAC evaluations.!
Project Monitors
The Project Monitors must possess valid NYS Asbestos Piu c^t nitor certificates. The Project
Monitors must have served as a third party project monitor on ai asbestos abatement
projects. Project Monitor must have performed final clehrance n ’Ctions on at least 50 asbestos
abatement projects. The Project Monitor must hast jvt^-ss to fri jtion services to schedule
pre-cleaning unit inspections with residents.
Air Monitoring Technicians
Air monitoring technicians must posses^plid NY: tsbesi ;t Sampling Technician (APST)
certificates. Technicians must have performed samplinOor at least 6 months.
nF f
HVAC System Inspectors
HVAC assessments and cl iKs inspei Obe conducted by qualified personnel. At a
miniuin •nnel shal ive an unde of HVAC system operation and experience in
utilizing ac ronmental sampling practices, current industry HVAC cleaning
procedure^ rplicable ii str\ siindards. , , - ,
Qu ft 4 fv ca-r'® *45 9’51“ S a, .
Background InAcstiua ~T c'ri
All contraetBfs and prs involved in the monitoring activities at residential buildings
under Ulis' contract are r ► for completing a background check on their employees prior to
employees beginning on- ,ite work and for screening unacceptable candidates fronvthe pool of on-
sheWorkers./Contractor bre required to maintain records of background checks for 4 years and to
them available h le DEP and EPA when requested. At a minimum, the background check
iclude:
1 T iw enforcement checks (5 years)
2. Professional license and certification
D, Specifications
This contract between DEP and the monitoring contractor shall be in force for 24 consecutive
months from the commencement date. The monitoring contractor must be prepared to mobilize
2
CITY_21MC1OO_OO4O89189
NYC-\/VTC_000332062
OCR can misread numbers and units. Confirm readings against the page image before using them.