Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 28%

Night shift daily workforce and equipment listing for World Trade Center project, Dec 11, 2001.

NYC-WTC_000322829
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 6th Road. Whiteslond, N.Y, 11357-{718)767-9000 DATE; DECEMBER 11, 2001 (NIGHT FINAL) BPM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & MILD

Labor II Equipment CLASSIFICATION QUANT. II Description MANNED STANDBY IDLE SUPERINTENDENT 2 ICAT 966 LOADER 1 PROJECT ENGINEER 1 itCAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS i HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1235 HAMMER HOE RAM 1 TEAMSTERS i 1 ' MECHANICS TRUCK 1 1 MECHANICS ■ ~ 1 ■ TOOLTRUCK 1 IHOUSE WRECKERS i 12 ■ TOOL VAN 1ROLL OFF DUMPTRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES HIGH DECK TRAILERS WELDING TRUCK [12007750/375 DOWN BELOW LOADING OUT DEBRIS FUELTRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERSAND EUKES UGHT TOWERS t3 1 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK FtOJECTION PLACED MATS AND MILLINGS_______ FLASHING ARROW BOARD 1 USED 446 : OFFICE TRAILER/6ENER. 1 CARGO BOXES 3 DELAYS; FLAT TRUCK 1 1’206 DOWN FROfot lT^^ UIS.'- RECOVERY.. , PUMP 375 DOWN FROM 10:130 TO 10:30 - RECOVERY ROLLER 1 RAINMAKER/GENIE LIFT 1

D escription of Work: ___________________ WORK completed '. LOAD OUT STEEL AND DEBRIS_______ ______ |35 GRACE AREA MAN TARPING AND TRIMMING STATIONS 34 EUKES MAN WATER STATIONS POR DUST CONTROL 131 FLATS - DOWNSTAIRS" MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS_____________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title; BY: ^Tor SUPERINTENDENT I

I —DAILY WORK FORCE REPORT 1211N.xls

CrTY_21MC100_010445001 NYC-WTC_000322829

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322829Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →