Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 32%

World Trade daily workforce and equipment, Dec 1, 2001 day shift.

NYC-WTC_000322822
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 161-45 61h Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment - CLASSIFICATION UANTIT I Description MANNED standby! IDLE SUPERINTENDENT CAT 966 LOADER ’ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE ' 1 OFFICE ENGINEER CAT 973 LOADER " 1 FOREMEN 2_ CAT 365 GRAPPLER / SAFETY OFFICER __ 1_ CAT 375 GRAPPLER : i i LABORERS________ 18 HITACHI 750 GRAPPLER J 1 IRONWORKERS_____ i_L HITACHI 550 GRAPPLER ; 1 LOCAL 14_________ __ 5 HITACHI 550 GRAPPLER j 1 LOCAL 15_________ 7 HITACHI 1200 GRAPPLERT 2 CARPENTER 185 CFM COMPRESSOR^ 1 CARPENTER FOREMAN 235 HAMMER HOE RAM j 1 TEAMSTERS__________ MECHANICS__________ HOUSE WRECKERS iT MECHANICS TRUCK ' TOOL TRUCK__________ IItoolvan I 1 ROLL OFF______________ DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 AWISCO OXY/ACET WELDING TRUCK 1_ >WISCO AWiSCO TIPS ~ OXY/ACET FUEL TRUCK__________ _ PICKUP TRUCKS LIGHT TOWERS________ _ SITE MULE__________ _ DUMP TRUCKS T I 3

to wheel dump truck r

I FLASHING ARROW BOARD OFFICE TRAILER/GENERj" CARGO BOXES________ ' 1 1 3 FLAT TRUCK 1 PUMP________________ 2

I ROLLER______________ _ RAINMAKER/GENIE LIFT = 1 1

Description of Work:________ ________ ___________________________ ________________ _____ GATEWAY 550 DELAYED 7 AMH:t5 PM, SEARCH AND RESCUE PORT AUTH P D_____________ 365 1-2PM FIRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25____________________ ____ CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC.________. MANNED TARPING AND TRIMMING STATIONS _________ ;____________________ ' MANNED WATER STATIONS FOR DUST CONTROL_________________________________ ■ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________ _________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2________________________ : CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC______________ . ELEVATIONS: 1200-264, 550-274, 375-284, 365-274 LOADS OUT 49 Approved By: Title;__________ For; SUPEF!INTENDENT

CITY_21MC100_010444990 NYC-WTC_000322822

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322822Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →