NYC 9/11 Public Portal Document
NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WASTEWATER TREATMENT
LIMITATIONS FOR EFFLUENT DISCHARGE TO SANITARY OR COMBINED SEWERS
Project Name/Location WTC - South Projection Date': January 2.2001
Sample Treatment
Parameter Limitations Units Note Results * Over/Under Required
Temperature <150 Deg F not measured
Total Petroleum Hydrocaitions 50 19.2 NO
pH 5-11 SU'S 8.09 NO
Cadmium 2 PPt” Daily Avg. 0.69 ppm <0.05 NO
Chromium (total) 5 PPni <0.05 NO
Copper 5 I ppm <0.05 NO
Lead 2 PP'^ <0.05 NO
Mercury 0.05 PP'” <0.002 NO
Nickel 3 PP*" <0.05 NO
Zinc 5 ppm <0.05 NO
Flash Point >140 DegF >140 NO
Benzene 134 PI* Method 602 <5 NO
Ethylbenzene 380 ppp Method 602 <5 NO
Toluene 74 PPP Method 602 8 NO
Xylenes 74 PPP Method 602 <5 NO
EPA method 608 only with
PBC's (total) 10C0 PPt MDL = 65ppt All below Detection Limit of 65 ppb
Total Suspended Solids No Limit 17 NO
Tetrachloroethylene 164 PPP <5 NO
MTBE 10 PPP 65 55 YES
Napthalene 47 PPP <5 No
Other PpP
* Indicate test data origin Independent Testing Labs - College Point, NY - sample collected 12/13/01
Grab sample from pump discharge
•• Analysis for PCB's are required ONLY if BOTH conditions listed below are met:
1) if proposed discharge > 10,000 gpd
2) if duration of a discharge > 10 days
CITY_21f4C10 0_0 03265099
NYC-WTC_000322753
OCR can misread numbers and units. Confirm readings against the page image before using them.