NYC-WTC_000341045
Day shift daily workforce and equipment entries for World Trade Center; January 16, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment for World Trade Center site, January 16, 2002.
NYC-WTC_000322156OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1/16/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 11 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 7 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED-TRAILER DELIVERIES: GRACE ASPHALT 70 CUBIC YARDS 3/4 STONE HIGH DECK TRAILERS ALL LOCK AND GLASS CO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2 HOURS FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 ■NOTE TRUCK 66 RAN 2 LOADS OF STONE FROM PUMP 2 WHITESTONE TO THE SITE RAINMAKER/GENIE LIFT
Description of Work: DELAYS: GRACE 750.375G,1200 GATEWAY 550G & MAZZOCHI 1200 FROM 7AM- 11AM DUE TO__________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WEST SIDE HIGHWAY GATEWAY 550G DELAYED 1PM- 4PM WITH RECOVERY AT AMEC ROAD_____________________________________ GRACE 1200 DELAYED 1PM-2:1SPM DUE TO YONKERS BURNERS BURNING CANDLESTICKS THAT WERE NOT AUTHORIZED TO BURN IN THAT AREA_________________________________________________________________ CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEWBRIDGE. ___________________________________________________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL____________________________________________________ MAINTAINED TRAFFIC INTQ AND OUT OF AREA_________________________________________________________ LOADS OUT: 33____________________________________________________ EUKESOUT: 132 _____ __________________________________________________ _____________
GRACE CONTRACTING CORP Approved By: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0116D.xls
CITY_2IMCl0 0_0 01445085 NYC-WTC_000322156
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000341045
Day shift daily workforce and equipment entries for World Trade Center; January 16, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356548
Day final daily workforce and equipment roster for World Trade site, Jan 16, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429389
Day shift roster and equipment list for World Trade site, Jan 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342298
Workforce and equipment summary for World Trade site, Jan 16, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305159
Day shift daily workforce and equipment at World Trade site, January 2002.
3 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237656
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 16, 2002 day shift.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419299
Night final daily workforce report with labor and equipment for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280009
Night shift daily workforce and equipment inventory for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302509
Night final daily workforce report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000341045
Day shift daily workforce and equipment entries for World Trade Center; January 16, 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356548
Day final daily workforce and equipment roster for World Trade site, Jan 16, 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429389
Day shift roster and equipment list for World Trade site, Jan 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342298
Workforce and equipment summary for World Trade site, Jan 16, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305159
Day shift daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237656
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 16, 2002 day shift.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000341045
Day shift daily workforce and equipment entries for World Trade Center; January 16, 2002.
Similar indexed content
Day final daily workforce and equipment roster for World Trade site, Jan 16, 2002.
Similar indexed content
NYC-WTC_000429389
Day shift roster and equipment list for World Trade site, Jan 2002.
Similar indexed content
NYC-WTC_000342298
Workforce and equipment summary for World Trade site, Jan 16, 2002.
Similar indexed content
NYC-WTC_000305159
Day shift daily workforce and equipment at World Trade site, January 2002.
Similar indexed content