NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Grace Contracting daily workforce report, World Trade Center

Machine-extracted title · confidence 44%

Daily workforce roster and equipment at World Trade Center site.

NYC-WTC_000322105
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1^-31-01 NIGHT

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION UANTIT Description MANNED IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 1 LOCAL 14 4 HITACHI 1200 GRAPPLER 1 LOCAL 15 7 COMPACTION TRUCK CARPENTER MECHANICS TRUCK 1 1 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS 22 TOOL VAN MECHANICS 1 ROLL OFF HOUSE WRECKERS 8 DUMP TRAILERS 11 LOW BED TRAILER HIGH DECK TRAILERS 7 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK 3 OFFICE TRAILER 1 TUBE TRAILER 3 FLASHING ARROW BOARD 1

♦ DAMAGED DURING OPERATION 1200 - 9:30 pm 750 - 1:30 pm

Description of Work:____________________________________________________________________________ LOADS OUT: 88_______________________________________________________________________________ MAN TARPING AND WATERING STATIONS FOR DUST CONTROL_____________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________ LOADS OF 3/4 STONE IN: 17____________________________________________________________________ FRESH AIR SYSTEMS INSTALLED ON GRAPPLERS_________________________________________________ DIRECTED TO USE GRAPPLE (1200) TO DEMO NE CORNER OF VISTA. GRAPPLE PISTON BENT DURING OPERATION_______________________________________________________________________________ __ |750 GRAPPLE PISTON BENT; REPLACED WITH THE 550 BOVIS TRIED TO DROP VISTA W/CABLES. DIDN'T WORK. MACHINES TIED UP FOR 4 HRS. THIS ALSO CUT OFF ACCESS TO THE SITE._____________________________________________________________________ 27 LOADS ON-SITE TRUCKING TO WIDEN ACCESS ROAD

Approved By: Title: Top SUPERINTENDENT V

CITY_21MC100_004554189

NYC-WTC_000322105

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322105Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →