NYC-WTC_000419206
Night shift daily workforce and equipment list for World Trade Center project, Nov 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Daily workforce roster and equipment at World Trade Center site.
NYC-WTC_000322105OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1^-31-01 NIGHT
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION UANTIT Description MANNED IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 1 LOCAL 14 4 HITACHI 1200 GRAPPLER 1 LOCAL 15 7 COMPACTION TRUCK CARPENTER MECHANICS TRUCK 1 1 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS 22 TOOL VAN MECHANICS 1 ROLL OFF HOUSE WRECKERS 8 DUMP TRAILERS 11 LOW BED TRAILER HIGH DECK TRAILERS 7 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK 3 OFFICE TRAILER 1 TUBE TRAILER 3 FLASHING ARROW BOARD 1
♦ DAMAGED DURING OPERATION 1200 - 9:30 pm 750 - 1:30 pm
Description of Work:____________________________________________________________________________ LOADS OUT: 88_______________________________________________________________________________ MAN TARPING AND WATERING STATIONS FOR DUST CONTROL_____________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________ LOADS OF 3/4 STONE IN: 17____________________________________________________________________ FRESH AIR SYSTEMS INSTALLED ON GRAPPLERS_________________________________________________ DIRECTED TO USE GRAPPLE (1200) TO DEMO NE CORNER OF VISTA. GRAPPLE PISTON BENT DURING OPERATION_______________________________________________________________________________ __ |750 GRAPPLE PISTON BENT; REPLACED WITH THE 550 BOVIS TRIED TO DROP VISTA W/CABLES. DIDN'T WORK. MACHINES TIED UP FOR 4 HRS. THIS ALSO CUT OFF ACCESS TO THE SITE._____________________________________________________________________ 27 LOADS ON-SITE TRUCKING TO WIDEN ACCESS ROAD
Approved By: Title: Top SUPERINTENDENT V
CITY_21MC100_004554189
NYC-WTC_000322105
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419206
Night shift daily workforce and equipment list for World Trade Center project, Nov 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389398
Daily workforce report for World Trade area listing personnel and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280043
Night shift daily workforce at World Trade site, Oct 2001.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280055
Day final daily workforce and equipment at World Trade, November 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305369
Day final daily workforce report for World Trade Center site, Dec 2, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419296
Day final daily workforce report with labor classifications and equipment for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322582
Night shift preliminary workforce entry for World Trade Center works.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305042
Day final daily workforce and equipment at World Trade site, Dec 2, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305234
Night preliminary daily workforce and equipment at World Trade site, Dec 2, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388337
Daily workforce and equipment listing for World Trade Center site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322809
Daily workforce and equipment details for World Trade job site, Nov 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419206
Night shift daily workforce and equipment list for World Trade Center project, Nov 1, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389398
Daily workforce report for World Trade area listing personnel and machinery.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280043
Night shift daily workforce at World Trade site, Oct 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280055
Day final daily workforce and equipment at World Trade, November 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305369
Day final daily workforce report for World Trade Center site, Dec 2, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419206
Night shift daily workforce and equipment list for World Trade Center project, Nov 1, 2001.
Similar indexed content
NYC-WTC_000389398
Daily workforce report for World Trade area listing personnel and machinery.
Similar indexed content
NYC-WTC_000280043
Night shift daily workforce at World Trade site, Oct 2001.
Similar indexed content
NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similar indexed content
NYC-WTC_000280055
Day final daily workforce and equipment at World Trade, November 2001.
Similar indexed content