NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Asbestos Air Test Results, 70 Battery Place

Machine-extracted title · confidence 49%

Air test results for asbestos at 70 Battery Place; multiple indoor locations sampled.

NYC-WTC_000319462–000319464
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Summary ofAsbestos Sampling Results Page 2 of 3 Address: 70 Battery Place Date sampled: November J9, 200J

fiber count is then compared to the asbestos standard. If the results were above 0.003 f/cc using the PCM methodology, additional analysis was performed to determine whether any of the fibers were asbestos. In this building, additional analysis was not warranted since the air sampling results were not greater than 0.003 f/cc.

Results of Phase Contrast Microscopy (PCM) testing of air at 70 Batteiy Place, Nov. 19, 2001 Area Sampled Outside Common Residence 1 Residence 2

Sample Numbers A-O-10 A-C-10 A-Rl-10 A-R2-10

Concentration of Fibers 0.001 0.002 0.001 0.001 (f'cc)* at 70 Battery Pl.

Concentration of Fibers <0.001 to 0.001 <0.001 to 0.002 <0.001 to 0.003 <0.001 to 0.003 (fZcc) in comparison locations NYC Re-occupancy 0.01 0.01 0.01 0.01 Standard (f/cc)** * ^cc is fibers in each cubic centimeter (cc) of air. This is calculated from the number of fibers seen on the air filter and the volume of air pulled through the filter measured in cubic centimeters of air. ** New York City Department of Environmental Protection asbestos clearance criteria for post-abatement work (Rules of the City of New York, Title 15, Chapter 1)

ASBESTOS DUST TEST RESULTS

The dust and debris samples were examined by two different laboratory methods for asbestos fibers, Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM). PLM is used to define asbestos containing material in dust and debris. A material is considered to be asbestos containing material if it contains more than 1% asbestos using the PLM method. The PLM method only counts the larger asbestos fibers. Therefore, if results by PLM were not greater than 1% asbestos, the sample was then analyzed by the TEM method that does count the smaller fibers. However, TEM analysis is not used for regulatory purposes for dust samples.

Asbestos and other fibers were not detected by the PLM methods in any of the dust samples. Further analysis by the TEM method did not detect any asbestos in the two residences and the outside dust sample was less than 1%. A slightly higher level (1.5%) was found in the dust in the lobby. However, since there is variability in laboratory analyses, the sample with 1.5% asbestos was reanalyzed and upon reanalysis, the level was found to be less than 1% asbestos. The DOH and New York City Department of Environmental Protection (DEP) inspected the lobby for any asbestos hazard after the sampling event and determined that the lobby had been subsequently cleaned and there was no visible dust or debris present.

CITY_21MC100_002452653

NYC-WTC_000319463

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000319463Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →