NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 77 pages

Background study draft for WTC asbestos, 2003

Machine-extracted title · confidence 37%

Background study draft on asbestos in schools related to WTC, March 2003.

NYC-WTC_000318678–000318754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

41894 Federal Register / Vol. 52, No. 210 / Friday, October 30, 1987 / Rules and Regulations

be comparable with contamination/ is considered complete if Z is less than small-scale, short-duration operations, background levels of blank filters. The or equal to 1.65. maintenance and repair (O&M) decision is based, in part, on Poisson (Note.—When no fibers are counted, the activities involving asbestos-containing statistics which indicate that four calculated detection limit for that analysis is materials and are not covered by the structures must be counted on a filter inserted for the concentration.) OSHA asbestos construction standard before the fiber count is statistically at 29 CFR 1926.58 or an asbestos worker 2. If the abatement site does not distinguishable from the count for one protection standard adopted by a State structure. As more information on the satisfy either (1) or (2) above, the site must be recleaned and a new set of as part of a State plan approved by performance of the method is collected, OSHA under section 18 of the samples collected. this criterion may be modified. Since Occupational Safety and Health Act. different combinations of the number D. Sequence for Analyzing Samples Employers wishing to be exempt from and size of grid openings are permitted It is possible to determine completion the requirements of § 763.121 (e)(6) and under the TEM protocol, the criterion is (fl(2)(ij may instead comply with the of the response action without analyzing expressed in structures per square all samples. Also, at any point in the provisions of this appendix when millimeter of filter to be consistent process, a decision may be made to performing small-scale, short-duration across all combinations. Four structures terminate the analysis of existing • O&M activities. per 10 grid openings corresponds to samples, reclean the abatement site, and Definition of Small-Scale. Short- approximately 70 s/mm^. collect a new set of samples. The . Duration Activities B. Sample Collection and Analysis following sequence'is outlined to minimize the number of analyses For the purposes of this appendix, 1. A minimum of 13 samples is small-scale, short-duration maintenance needed to reach a decision. required; five samples collected inside activities are tasks such as, but not the abatement area, five samples 1. Analyze the inside samples. 2. If at least 1.199 L of air for a 25 mm limited to; collected outside the abatement area, 1. Removal of asbestos-containing filter or 2,799 L of air for a 37 mm filter is two field blanks, and one sealed blank. insulation on pipes, 2. Sampling and TEM analysis must collected for each inside sample and the arithmetic mean concentration of 2, Removal of small quantities of be done according to either the mandatory or nonmandatory protocols structures per square millimeter of filter • asbestos-containing insulation on beams is less than or equal to 70 s/mm’’, the or above ceilings, in Appendix A. At least 0.057 mm^ of filter must be examined on blank filters. response action is complete and no 3, Replacement of an asbestos­ further analysis is needed. containing gasket on a valve, C. Interpretation of Results 3. If less than 1,199 L of air for a 25 4, Installation or removal of a small 1. The response action shall be mm filter or 2,799 L of air for a 37 mm section of drywall, considered complete if either; filter is collected for any of the inside 5, Installation of electrical conduits a. Each sample collected inside the samples, or the arithmetic mean through or proximate to asbestos­ abatement area consists of at least 1,199 concentration of structures per square containing materials. L of air for a 25 mm filter, or 2,799 L of millimeter of filter is greater than 70 Small-scale, short-duration air for a 37 mm filter, and the arithmetic s/mm* analyze the three blanks, maintenance activities can be further mean of their asbestos structure 4. If the arithmetic mean defined, for the purposes of this subpart, concentrations per square millimeter of concentration of structures per square by the following considerations; filter is less than or equal to 70 s/mm^; millimeter on the blank filters is greater 1. Removal of sm ill quantities of or than 70 s/mm’, terminate the analysis, asbestos-containirv materials (ACM) b. The three blank samples have an identify and correct the source of blank only if required in the performance of arithmetic mean of the asbestos contamination, and collect a new set of another maintenance activity not structure concentration on the blank samples, intended as asbestos abatement. filters that is less than or equal to 70 5. If the arithmetic mean 2. Removal of asbestos-containing s/mm’and the average airborne concentration of structures per square thermal system insulation not to exceed asbestos concentration measured inside millimeter on the blank filters is less amounts greater than those which can the abatement area is not statistically than or equal to 70 s/mm®, analyze the be contained in a single glove bag. higher than the average airborne outside samples and perform the Z-test, 6, If the Z-statistic is less than or 3. Minor repairs to damaged thermal asbestos concentration measured system insulation which do not require outside the abatement area as equal to 1.65, the response action is complete. If the Z-statistic is greater removal. determined by the Z-test, The Z-test is than 1.65, reclean the abatement site 4. Repairs to a piece of asbestos- carried out by calculating and collect a new set of samples. containing wallboard.. 5. Repairs, involving encapsulation. Appendix B to Subpart E—Work 2= A ~ ____ Practices and Engineering Controls for Small-Scale, Short-Duration Operations enclosure or removal, to small amounts of friable asbestos-containing material only if required in the performance of 0.8(Vn, + 1%o)’/2 Maintenance and Repair (O&M) Activities Involving ACM emergency or routine maintenance activity and not intended solely as This appendix is not mandatory, in asbestos abatement. Such work may not that LEAs may choose to comply with exceed amounts greater than those where Y, is the average of the natural_ all the requirements of 40 CFR 763.121, which can be contained in a single logarithms of the inside samples and Yo Section 763.91(b) extends the protection prefabricated minienclosure. Such an is the average of the natural logarithms provided by EPA in its 40 CFR 763.121 enclosure shall conform spatially and of the outside s.-.nples. n, is the number for worker protection during asbestos geometrically to the localized work area. of inside samp! s ^nd Oq is the number abatement projects to employees of in order to perform its intended of outside samp.es. he response action local education agencies who perform containment function.

NYC-WTC_000318745

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318745Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →