NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 5 pages

Dust protection plan draft, post-disaster

Machine-extracted title · confidence 52%

Draft plan for dust protection and suppression during post-disaster search, demolition, cleanup.

NYC-WTC_000317882–000317886
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DUST PROTECTION AND SUPPRESSION PLAN

2.3 Returning Home When workers return “home” with clothing that has been contaminated with dust, they should do the following to prevent contaminating their residence: • Immediately remove clothing contaminated with dust. • Place all contaminated clothing in plastic bag(s) until washing. Do not shake dust from clothing. • Launder contaminated clothes twice and separate from other clothing. • Dispose of plastic bag(s); do not reuse.

3. DEBRIS/DUST REMOVAL AND LOADING Search/rescue, demolition, and cleanup activities will require the removal of vast quantities of debris that could potentially spread contaminated dust within and outside the work area(s). The following dust suppression measures should be used to control the generation and spread of dust: • Minimize handling of debris/dust by avoiding, where possible, multiple handling. • Minimize the drop height of debris from equipment when dumping into haul trucks or onto ground surface. • At locations in rubble piles where debris is separated by dropping, the rubble should be periodically wet down. • Where practical, aerial mist sprayers could be used to help control dust when material is double handled or dumped. • In areas with thick dust accumulation (including streets and sidewalks), use a truck­ mounted, high efficiency particulate air (HEPA) vacuum or, if not available, use standard large volume vacuum trucks. • In areas where vacuum trucks are not used, lightly wet down areas prior to initiating debris/dust removal activities with shovels or other tools/equipment. • Either wet down, or cover and secure debris/dust loads in haul trucks. Haul trucks should not be allowed to leave the work area unless these measures have been completed. • Assign haul trucks designated routes to and from disposal site(s). • Haul truck speed in work areas should not exceed 10 mph. • Haul routes to disposal sites should be periodically wet down and/or cleaned with “street sweepers” to control dust.

4. WASH DOWN AND DECONTAMINATION STATIONS At a minimum, all haul trucks leaving the work area should be washed as described in Section 4.2 below. If agency sampling (e.g., ambient air or bulk sample) results from areas within or in close proximity to the work area exceed the prescribed “action level” for asbestos, the measures described in Section 4.3 below should be implemented to minimize the spread of dust into adjacent residential/commercial areas and along haul routes.

9/19/2001 Page 3 of 5 DRAFT

CITY_21MC100_000948295 NYC-WTC_000317884

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000317884Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →