GRACE CONTRACTING CORP. 1151-45 6(h Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: MONDAY 12/3/01 NIGHT (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & COOL ___________ i_________ ____________________ I Labor_________ Equipment : CLASSIFICATION QUANT. Description MANNED STANDBY DLE SUPERINTENDENT j_________________ 2 CAT 966 LOADER 1 PROJECT ENGINEER ;_________________ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER ! CAT 973 LOADER 1 FOREMEN ; 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS__________ _________________ 16 HITACHI 750 GRAPPLER 1 IRON WORKERS _________________ HITACHI 550 BACKHOE 1 LOCAL 14____________ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 ; 8 HITACHI 1200 GRAPPLER 1 CARPENTER__________________________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 DUG INTO VISTA FROM EAST WITH 1200 - LOADED EUKES WELDING TRUCK 375 DUG PARALLEL TQ' WEST SIDE OF WEST WALL FUEL TRUCK 1 PROGRESSING NORTH - LOADED EUKES PICKUP TRUCKS 2 750 DUG PARALLEL TQ SOUTH SIDE OF NORTH WALL LIGHT TOWERS 13 PASSED DEBRIS TO GATEWAYS 550 THEN TO 365 SITE MULE 3 DROPPED PORTION OF WEST WALL___________________ DUMP TRUCKS TULLY DRESSED ROAD WITH MILLINGS 10 WHEEL DUMP TRUCK DUG OUT MILLINGS WEST OF 750 TON CRANE TO LEVEL FLASHING ARROW BOARD 1 AND SET MATS. OFFICE TRAILER/GENER. 1 NOTE: TULLY'S PC750 FELL INTO SOUTH PORTION OF CARGO BOXES 3 WEST SLURRY WALL -4200 PULLED IT UP. FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1
Description of Work:
LOADS OUT:91, EUKE LOADS 17________________ LOAD OUT STEEL AND' DEBRIS_________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA EXCAVATE & GRADE CRANE PAD - SET MATS
GRACE CONTRACTING CORP Approved By: Title: ~ BY: For: SUPEFilNTENDENT '
DAILY WORK FORCE REPORT 1203N.xls
CITY_21MC100_003025901
NYC-WTC_000305614
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280007
Night shift workforce and gear at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291296
Night final daily workforce report for World Trade site (Dec 10, 2001).
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302520
Sunday shift daily workforce and equipment at World Trade, Dec 23, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291275
Day final daily workforce report for World Trade Center project, Nov 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278989
Night shift daily workforce report for World Trade Center site, December 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429727
Night final daily workforce and equipment at World Trade Center, Dec 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280007
Night shift workforce and gear at World Trade Center, December 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
Similar indexed content
NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similar indexed content
NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similar indexed content
Night shift workforce and gear at World Trade Center, December 3, 2001.
Similar indexed content
NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content