NYC-WTC_000388459
Day shift daily workforce report for World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Crew and equipment listings for World Trade Center project on December 4, 2001.
NYC-WTC_000305613OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6(h Road. Whrtestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 4, 2001 (DAY FINAL) =ss== DAILY WORK FORCE REPORT
__________________ j___________________ Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor_________ , Equipment CLASSIFICATION QUANT. Description MANNED STANDBY! PLE! SUPERINTENDENT !__________________ 2 CAT 966 LOADER________ 1 PROJECT‘ENGINEER__________________ 2 CAT 446 BACKHOE_______ 1 OFFICE ENGINEER ।__________________ CAT 973 LOADER________ 1 FOREMEN i 1 CAT 365 GRAPPLER 1 SAFETY OFFICER [ CAT 375 GRAPPLER 1
? LABORERS___________________________ HITACHI 750 GRAPPLER 1 IRON WORKERS :___________________ ■ HITACHI 550 GRAPPLER 2 LOCAL 14 ■ HITACHI 550 GRAPPLER 1 LOCAL 15______ ______________ 8 ■ HITACHI 1200 GRAPPLER 2 CARPENTER ______________ ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN___________ _2. ■ 235 HAMMER HOE RAM 1
I TEAMSTERS ___________________ ■ MECHANICS TRUCK MECHANICS______ ■___________________ ■ TOOL TRUCK____________ HOUSE WRECKERS^ ■ TOOL VAN 1 ■ ROLL OFF_______________ ■ DUMP TRAILERS 7 ■ LOW BED TRAILER_______ DELIVERIES: OZONE PARK LUMBER ■ HIGH DECK TRAILERS 3 AWISCO BATTERIES ■ WELDING TRUCK 1 ’FUEL TRUCK _1_ ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 13 ■ SITE MULE______________ 3 ■ DUMP TRUCKS__________ ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 2 OFFICE TRAILER/GENER. 2 ' CARGO BOXES__________ 3 ' FLAT TRUCK 1 ILIGHT TOWERS USED FOR 2.5 HOURS ■ PUMP 2 ■ ROLLER________________ 1 ■ RAINMAKEFVGENIE LIFT 1
Description of Work:____________________________ LOADS OUT: 67 ____________________________ LOAD OUT STEEL AND DEBRIS .MANNED TARPING AND TRIMMING STATIONS ■MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAt/ [CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS !ELEVATIONS: ALL MACHINES LEVEL B-5 253 YUKE LOADS 76 GRACE CQNTRAGTTNG CORI^ Approved By: Title:_______ BY: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1204D.xls
CITY_21MC100_004045759
NYC-WTC_000305613
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388459
Day shift daily workforce report for World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429733
Day shift daily labor/equipment roster for World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269188
Day/equipment and labor report for World Trade Center site, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280840
Day final daily workforce and equipment at World Trade, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278983
Night shift daily workforce report for World Trade Center site, December 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305090
Day shift labor and equipment at World Trade; Feb 4, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361544
Daily workforce and equipment at World Trade Center site, Dec 8, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419322
Day preliminary daily workforce and equipment for World Trade, January 10, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322598
Night preliminary workforce/equipment roster for World Trade site, Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278685
Day shift daily workforce and equipment at World Trade Center, December 5, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388433
Daily labor and equipment counts for World Trade project site on Nov 24, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388459
Day shift daily workforce report for World Trade Center, December 3, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429733
Day shift daily labor/equipment roster for World Trade Center site, Dec 8, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269188
Day/equipment and labor report for World Trade Center site, Dec 6, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280840
Day final daily workforce and equipment at World Trade, Jan 27, 2002.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278983
Night shift daily workforce report for World Trade Center site, December 13, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388459
Day shift daily workforce report for World Trade Center, December 3, 2001.
Similar indexed content
NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similar indexed content
NYC-WTC_000429733
Day shift daily labor/equipment roster for World Trade Center site, Dec 8, 2001.
Similar indexed content
NYC-WTC_000269188
Day/equipment and labor report for World Trade Center site, Dec 6, 2001.
Similar indexed content
NYC-WTC_000280840
Day final daily workforce and equipment at World Trade, Jan 27, 2002.
Similar indexed content