GRACE contracting CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 11,2001 (DAY ) FINAL DAILY WORK FORCE REPORT ______________ !_______________ Job Name & Location: World Trade Center Contract No. Weather Conditions j
; Labor Equipment i CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT i__________________ 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER I 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK ' 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 8 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: TRIBORO HARDWARE HIGH DECK TRAILERS' AWISCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 9 LIGHT TOWERS ' 13 SITE MULE 3 |dump trucks 10 WHEEL DUMP TRUCK DELAYS: ENTIRE JOB SHUT DOWN FOR 1 HOUR FLASHING ARROW BOARD 1 DUE TC MEMORIAL SERVICE' OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 pump 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: :_______________________________________________________ _ DELAYS 1200 DOWN 11 AM ALL DAY TO SEARCH FOR PORT AUTHORITY POLICE OFFICER LOAD OUT STEEL AND DEBRIS_________________________________________________ MANNED TARPING AND TRIMMING STATIONS____________________________________ MANNED WATER STATIONS FOR DUST CONTROL_______________________________ ' MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________________ ___ CONTINUE removing DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS____________________________________________ , ELEVATIONS: ALL MACHINES LEVEL B-5 253______________________________________ LOADS OUT 50 YUKE LOADS 48 __ GRACE CONTI^CTIN^O Approved By: Title: ~ BY: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1211D.xls
CITY_21MC100_003025891
NYC-WTC_000305599
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305201
Day final daily workforce at World Trade Center, December 11, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278988
Day shift daily workforce report for World Trade Center site, December 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266915
Day shift daily workforce report for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305387
Grace Contracting daily workforce details and equipment for World Trade Center job.
4 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291295
Day final daily workforce report for World Trade site (Dec 11, 2001).
4 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267219
Daily workforce and equipment summary for World Trade Center site, Dec 11, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305046
Final daily workforce and equipment roster for World Trade Center project, December 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280098
Day shift daily workforce and equipment details for World Trade Center site, Dec 11, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305201
Day final daily workforce at World Trade Center, December 11, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278988
Day shift daily workforce report for World Trade Center site, December 11, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266915
Day shift daily workforce report for World Trade Center project.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291295
Day final daily workforce report for World Trade site (Dec 11, 2001).
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278676
Workforce and equipment summary for World Trade Center project, December 11, 2001.
Similar indexed content
NYC-WTC_000305201
Day final daily workforce at World Trade Center, December 11, 2001.
Similar indexed content
NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
Similar indexed content
NYC-WTC_000278988
Day shift daily workforce report for World Trade Center site, December 11, 2001.
Similar indexed content
NYC-WTC_000266915
Day shift daily workforce report for World Trade Center project.
Similar indexed content