NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 13 2001

Machine-extracted title · confidence 42%

Night final daily workforce and equipment at World Trade Center site, December 2001.

NYC-WTC_000305595
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-4S 6th Road, Whitestone,! N.Y. 11357-(718) 767-9000 DATE: DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions VERY MILD AND FOGGY

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT j 1 CAT 966 LOADER 1 PROJECT ENGINEER I 1 CAT 446 BACKHOE 1 OFFICE ENGINEER i CAT 973 LOADER 1 FOREMEN ' 1 CAT 365 GRAPPLER 1 SAFETY OFFICER ; CAT375GRAPPLER 1 LABORERS_________ _ 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOL VAN ROLL OFF DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE __ LOW BED TRAILER NORTH OF VISTA & PASSING TO TO 750 - 750 LOADING HIGH DECK TRAILERS TULLY EUKES & FLATS IN BOTTOM OF PIT WELDING TRUCK 973 ALSO LOADING IN BOTTOM_________________ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK 1 FLASHING ARROW BOARD 1 375 - FORCED AIR SY;STEM BRACKETS BROKE OFFICE TRAILER/GENER, 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW PUMP 2 78 OUT OF AMEC (53 GRACE. 25 DOS/DOT) ROLLER RAINMAKER/GENIE LIFT 1 550 BUCKET 1 Description of Work: j_______________________________________ WORK PERFORMED j_______________________________________ LOAD OUT STEEL AND DEBRIS_______________________________ MANNED TARPING AND TRIMMING STATIONS___________________ MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS; ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: BY: For; SUPERINTENDENT

DAILY WORK FORCE REPORT 1213N,xls

CITY_21MC100_003025887

NYC-WTC_000305595

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305595Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →