GRACE CONTRACTING CORP. 151-45 6lh Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 18, 2001 (DAY) ANAL DAILY WORK FORCE REPORT
iJob Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description SUPERINTENDENT 1 |CAT 966 LOADER h; 1 PROJECT ENGINEER 2 kT 446 BACKHOE »r 1 OFFICE ENGINEER 1ICAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER Z4 f /S' LABORERS 23 HITACHI 750 GRAPPLER 1 /T IRON WORKERS 1 IIhITACHI 550 GRAPPLER 1 T LOCAL 14 6 HITACHI 550 GRAPPLER H 1 LOCAL 15 8 HITACHI 1200 GRAPPLER M 1 r< CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 1 MECHANICS TRUCK 2 MECHANICS l^e 2 TOOLTRUCK HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: AWISCO_____________________ HIGH DECK TRAILERS AUSTER RUBBER WELDING TRUCK 1 BLACK BEAR FUEL TRUCK T 1 GRACE ASPHALT 193.30 TONS PICKUP TRUCKS 8 LIGHT TOWERS 48- SITE MULE 3 DUMP TRUCKS ‘NOTE* 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 ROLLER LIGHT TOWERS USED FOR 3 HOURS RAINMAKEFl/GENIE LIFT 1
Description of Work:_______ _ ____________________________________________________ DELAYS: 12:30- 2:15 OUT OF HOLE FOR PULLING OF BUILDING #6_____________________________ DELAYS: HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 & 2__________________ MANNED TARPING AND TRIMMING STATIONS______________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL_______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY ______________________________________ _____
GRACE CONTRACTING CORP Approved By; Title: BY: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1218D.xls
C:iTY_21MC100_001290532 NYC-WTC_000305532
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266917
Day shift daily workforce report for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305225
Night preliminary daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269189
Night final daily workforce and equipment at World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266917
Day shift daily workforce report for World Trade Center project.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305225
Night preliminary daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similar indexed content
NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
Similar indexed content
NYC-WTC_000266917
Day shift daily workforce report for World Trade Center project.
Similar indexed content