NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 37%

Night final daily workforce and equipment listing for World Trade Center site.

NYC-WTC_000305500
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. I5l-»s SOI Poao. W/hhetton*. N.Y. 11367-(718)767.9000 DATE: 2/3/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions:

Labor 2_ZJ lI QUANTjf Equipment CLASSIFICATION I Description MANNED STANDBY! IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER 1. OFFICE ENGINEER CAT 375 GRAPPLER 1 1 FOREMEN 2 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACH11200 GRAPPLER 1 T LABORERS_______________________________ 12 165 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 hammer HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 5 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 DUMP TRAILERS 1 TEAMSTERS (FLATBEDS. DUMPS. AND EUKES) 14 EUKES 4 MECHANICS 1 HIGH DECK TRAILERS T HOUSE WRECKERS WELDING TRUCK HfUELTRUCK ~ 1 1 PICKUP TRUCKS ~ 3 IILIGHT TOWERS ~ 5 DELIVERIES: ■ SITE MULE 3 •COMPRESSOR RAN DURING SHIFT UNMANNED* ■ DUMP TRUCKS ' 10 WHEEL DUMP TRUCK ' FLASHING arrow BOARD ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 4 ■ FLAT TRUCK 1 ■ PUMP 2

■

■■

ante Dascription of Work: ___________________ COMPLErSD WORK CONTINUED TO REMOVE DEBRIS FROM LOWER LEVELS OF WTO COMPLEX. MACHINES AT EL. B6 MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA REC0R0|DjiMES^^D^NUMBER5^FTRU^T0ADS^0FDEBRis7R0MjlTE___2ZZZZ__ LOADS OUT: 101 YUKES; 166 DOT LOADS: 93_________ ___________ ______________________ _ _____________________________________ DELAYS: RECO'^RY IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS; 1200 LOST 1HR 0200-0300

GRACE CONTRACTING CORP Approved By: BY: Title: For SUPERINTENDENT

DAILY WORK FORCE REPORT0203N.xls

CITY_21MC100_001281912 NYC-WTC_000305500

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305500Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →