Daily work force report, World Trade Center site, Dec 2001

Machine-extracted title · confidence 45%

Labor and equipment counts for World Trade Center project site on December 11, 2001.

NYC-WTC_000305388
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP, j 151-45 6lh Road, Whitestone. N.Y. 113S7-(718) 787-9000 DATE: DECEMBER 11, 2001 (NIGHT FINAL) L 8PM- DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & MILD

Labor 11 Equipment CLASSIFICATION QUANT. Il Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER ‘ 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 17 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 7 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 12 ■ TOOLVAN ■ ROLL OFF ■ DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE ■ LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES; ■ HIGH DECK TRAILERS ■ WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS ■ FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS ■ PICKUP TRUCKS 3 TRAILERS AND EUKES ■ LIGHT TOWERS 13 ■ SITE MULE 3 550 ON TOP LOADING OUR TRUCKS i ■ DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH ■ 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS ■ FLASHING ARROW BOARD 1 USED 446 . ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 DELAYS:__________________________ ; ■ FLAT TRUCK 1 1200 DOWN FROM 11:45 TO 1:15 - RECOVERY ' PUMP 2 375 DOWN FROM 10:00 TO 10:30 - RECOVERY ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1 J) Description of Work: WORK COMPLETED LOAD OUT STEEL AND DEBRIS ,________ MAN TARPING AND TRIMMING STATIONS 35 GRACE AREA 34 EUKES nr MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ,ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title:_______ BY: For: SUPERINTENDENT T

DAILY WORK FORCE REPORT 1211N.xls

CITY_21MC1OO_OO3123764

NYC-WTC_000305388

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305388Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →