Daily work force report, World Trade Center, Dec 9, 2001

Machine-extracted title · confidence 42%

Day shift daily workforce report for World Trade Center site, Dec 9, 2001.

NYC-WTC_000305382
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISMS 8!h Road. Whitestono. N.Y. 11357-(718) 787-9000 DATE: SUNDAY 12-9-01 DAY ass DAILY WORK FORCE REPORT

iJob Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY idle! SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 27 HITACHI 750 GRAPPLER 1 [IRONWORKERS HITACHI 550 GRAPPLER 1 |LOCg.14. . ....... ~ 4 HITACHI 550 GRAPPLER 7 LOCAL 15 9 HITACHI lablfGRAPPLER 1 CARPENTER.................... 185 CFM COMPRESSOR ' 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 ifEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK 1 HOUSE WRECKERS ■ TOOL VAN 1 ■ ROLLOFF ■ DUMP TRAILERS 8 ■ LOW BED TRAILER DELIVERIES: ■ HIGH DECK TRAILERS 2

I— ■ WELDING TRUCK ■ FUEL TRUCK ■ PICKUP TRUCKS 1 1 1 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ' FLAT TRUCK ■ PUMP 2 ' ROLLER ■ RAINMAKER/GENIE LIFT 1

Oescription of Work:_____________________________________________________________________________________ 1 LOADS OUT: 93 LOAD OUT STEEL AND DEBRIS__________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS_________________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________________________________________ _ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS______________________________________________ _ ELEVATIONS: ALL MACHINES LEVEL B-5 253 ______________________________________________ _ SEVERAL BRIEF DELAYS FOR FDNY RECOVERY THROUGHOUT THE DAY

GRACE CONTRACTING CORP / Approved By: Title:______ ~aY: For:

DAILY WORK FORCE REPORT1209D.xls

CITY_21MC100_003125814 NYC-WTC_000305382

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305382Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280006

World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.

Similar indexed content

Compare copies and versions →