NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 32%

Night preliminary daily workforce report for World Trade Center site, showing personnel and machinery.

NYC-WTC_000305241
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Roa I. Whitestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 1.2001 (NIGHT PRELIMINARY) 8:00 PM DAILY WORK FORCE REPORT

Job Name Location: World Trade Center Contract NO. Weather Conditions 1

Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT E NGINEER 1 CAT 446 BACKHOE 1 lOFFICE EN 3INEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OF FICER CAT 375 GRAPPLER 1 22 HITACHI 750 GRAPPLER 1 IRON WOR (ERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER_________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRIECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description Work: ~ PRELIMINA 3Y/ANTICIPATED WORK____________________________________________________ CONTINUE rO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC.______________ MAN TARPI MG AND TRIMMING STATIONS_______________________________________________ MAN WATE 3 STATIONS FOR DUST CONTROL___________________________________________ MAINTAIN 1 RAFFIC FLOW IN AND OUT OF AREA_________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2 CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ELEVATION S: 1200-264. 550-274, 375-284. 365-274

GRACE CONTRACTING CORP Approved B; TiOe: BY:^— For: SUPERINTENDENT

CITY_21MC100_001231365 NYC-WTC_000305241

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305241Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →