Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Sunday 12/9/01 day MV daily workforce at World Trade Center.

NYC-WTC_000305207
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISMS 6thRoad. Whitestone, N.Y. 11357-(718) 767-9000 DATE: SUNDAY 12-9-01 DAY MV

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 27 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS TOOL VAN 1 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER DELIVERIES; HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 1 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:_______________________________________________________________________________________ LOADS OUT: 93_________________________________________________________________________________________ LOAD OUT STEEL AND DEBRIS MAN TARPING AND TRIMMING STATIONS__________________________________________________________ __ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ~ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS_________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253______________________________________________________________ SEVERAL BRIEF DELAYS FOR FDNY RECOVERY THROUGHOUT THE DAY

GRACE CONTRACTING CORP / lApproved By: Title: ~BY: For: SUPERINTENDENT V

DAILY WORK FORCE REPORT1209D.xls

CITY_2IMCl0 0_0 01231032 NYC-WTC_000305207

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305207Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280006

World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.

Similar indexed content

Compare copies and versions →