GRACE CONTRACTING CORP. 15a-AS eth Road. Wniieslone. N.Y. 11337-(718) 767-9000 DATE: 2/1/02 NIGHT FINAL
dailywowTorcFrepo^
Job Nams & Location; World Trade Center Contract No. Weather Conditions; Cold and Blustery
Labor Equipment CLASSIFi”TION QUANT. ______ Description______ MANNED 'STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 FIELD ENGINEER CAT 365 GRAPPLER 1 FOREMEN 3 CAT 375 GRAPPLER I-—?-— SAFETY OFFICER HITACHI 750 GRAPPLER i LABORERS 12 HITACHI 1200 GRAPPLER 1 IRON WORKERS 165 CFM COMPRESSOR 1 LOCAL 14 5 235 HAMMER HOE RAM LOCAL 15 6 MECHANICS TRUCK 1 • 1 CARPENTER [ TOOL TRUCK CARPENTER FOREMAN TOOLVAN TEAMSTERS (FUEL)________________________ 1 ROLL OFF TEAMSTERS (FLATBEDS. DUMPS, AND EUKES) 14 DUMP TRAILERS MECHANICS 1 LOW BED TRAILER HOUSE WRECKERS HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 DELIVERIES; N/A ■ LIGHT TOWERS 5 ■ SITE MULE 3 ■ DUMP TRUCKS DELAYS: SLOW MOVEMENT REGARDING ■ 10 WHEEL DUMP TRUCK EUCLIDS DUE TO FDNY/NYPD/PAPD ■ FLASHING ARROW BOARD REQUEST TO SPREAD AND SEARCH ■ OFFICE TRAILER/GENER. 1 AT A MANAGABLE RATE AT THE ■ CARGO BOXES 3 transfer STATION LOCATED AT THE ' FLAT TRUCK TOP OF TULLY ROAD ■ PUMP 2
Description of Work:_______________________________________________________________ COMPLETED WORK: ______ ________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX (NORTH TOWER) MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE
LOADS OUT; YUKES: T DOT LOADS: GRACE CONTRACTING COR1<3 Approved By: IBY: / / Title:_______ For superintendent 6 DAILY WORK FORCE REPORT0201N.xls
CITY_21MC1OO_OO3125369
NYC-WTC_000305086
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388154
Night shift daily workforce and equipment report for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342328
Night final daily workforce and equipment at World Trade site, Feb 2002.
3 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361521
Night final daily workforce and equipment at World Trade site, Feb 11 2002.
3 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305076
Daily workforce and equipment entries for World Trade Center site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280755
Night shift workforce and equipment at World Trade Center, Dec 3, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237693
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
1 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237657
Grace Contracting Corp. daily log of laborers and equipment at the World Trade site for January 15, 2002 night shift.
2 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419178
Night final daily workforce and equipment for 2/5/02 World Trade.
1 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432590
Night shift workforce and equipment for World Trade Center, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388154
Night shift daily workforce and equipment report for World Trade Center project.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342328
Night final daily workforce and equipment at World Trade site, Feb 2002.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361521
Night final daily workforce and equipment at World Trade site, Feb 11 2002.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305076
Daily workforce and equipment entries for World Trade Center site, Jan 2002.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280818
Preliminary daily workforce and equipment for World Trade site, Jan 11, 2002.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388154
Night shift daily workforce and equipment report for World Trade Center project.
Similar indexed content
NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
Similar indexed content
NYC-WTC_000342328
Night final daily workforce and equipment at World Trade site, Feb 2002.
Similar indexed content
NYC-WTC_000361521
Night final daily workforce and equipment at World Trade site, Feb 11 2002.
Similar indexed content
NYC-WTC_000305076
Daily workforce and equipment entries for World Trade Center site, Jan 2002.
Similar indexed content