Daily work force report, World Trade Center, Feb 2002

Machine-extracted title · confidence 42%

Daily workforce and equipment assignments for World Trade Center job, Feb 2002.

NYC-WTC_000305065
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 16i-lSS«iRoad. WWtoetona. W.V. nSS7-(718) 707.6000 DATE: 1722/02 NIGHT FINAL

r DAILY WORK FORCE REPORT

Job Nam« & Location; World Trade Canter Contract No. WeatherCondHions____________________

Labor Equipm^t CLASSIFICATi^ QUANT. Description ' [MANNED manned Tstandby IDLE SUPERINTENDENT CAT 968 loader 1 PROJECT ENGINEER 1 ■ CAT 973 LOADER________ 1 OFFICE ENGINEER CAT 36S GRAPPLER 1 FOREMEN 1 ■ CAT 375 GRAPPLER 2 SAFETY OFFICER ■ CAT 375 GRAPPLER 1 laborers_______ 9 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI S50 GRAPPLER 1 LOCAL 14____________ ■ HITACH11200 GRAPPLER 1 LOCAL IS____________ 6 ■ las CFM COMPRESSOR 1 CARPENTER_________ 1235 HAMMER HOE RAM •MANNED BY TULLY CARPENTER FOREMAN ■ MECHANICS TRUCK 1 1 TEAMSTERS (FUEL) 1 ■ TOOL TRUCK____________ MECHANICS________ 2 ■ TOOL VAN______________ HOUSE WRECKERS 2 ■ ROLL OFF______________ ■ DUMP TRAILERS_________ 8 YUKES_________________ 4 ■s’ HIGH DECK TRAILERS WELDING TRUCK DELIVERIES: FUEL TRUCK 1 ■ PICKUP TRUCKS 3 1 LIGHT TOWERS 5 SITE MULE 2 'NOTE: WTC TRUCKING 14 DRIVERS DUMPTRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 - DELAYS: TRUCK 62 WAS DELAYED FOR 2.5 HOURS CARGO BOXES 4 DUE TO BRAKE PROBLEMS FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT •235 MANNED BY TULLY FROM 5PM-12AM

..... OescrlDtion of Work. COMPLETED WORK B CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA TRUCKS TO PIER 6 DELAYED APPROXIMATELY 1 HOUR BY DOT AND ConEd WORK ON TUNNEL AMD ROAD LOADS OUT; 117 " YUKESOUT; 120

GRACE CONTRACTING CORP Approved By: BY: Titiei ■fon SUPERIN TEN DEMI

DAILY WORK FORCE REPORToizMLX^

CrTY_21MC100_004323886 NYC-WTC_000305065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →