Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 34%

Night final daily workforce and equipment at World Trade Center, January 23, 2002.

NYC-WTC_000432575
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 16WSWRMII. WWMOna. N.Y, 11357-p-1«1 W-«0M DATE; 1/22/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Nama & Location: World Trade Canter Contract No. Iweather Conditions________________

I [SUPERINTENDENT IPROJECT ENGINEER Labor CLASSIFICATI^ quj

1 H Il Equipment Description jCAT 968 LOADER IICAT 973 LOADER 1 HoffiCE ENGINEER IlCAT 365 GRAPPLER 1 FOREMEN 1 Scat 37S grappler T jSAFETY OFFICER ilcAT 375 GRAPPLER ~ 1 UtAaORERS 9 ^HtTACH) 750 GRAPPLER ~ 1 illRON WORKERS IIhITACHI 5S0 GRAPPLER ~ 1 IIlocal t4 2 I HITACHI 1200 GRAPPLER 1 LOCAL IS 6 has CFM COMPRESSOR 1 CARPENTER________ 11235 HAMMER HOE RAM 'MANNED 8Y TULLY CARPENTER FOREMAN IImechanics truck ~ 1 1 TEAMSTERS (FUEL) 1 [TOOL TRUCK MECHANICS 1 frOOLVAN HOUSE WRECKERS 2 ROLLOFF_____________ DUMP TRAILERS________ a YOKES________________ 4 HIGH DECK TRAILERS 2 WELDING TRUCK_______ DELIVERIES: FUEL TRUCK___________ 1 PICKUP TRUCKS 3 UGHT TOWERS 5 SITE MULE_____________ 2 l-NOTE: wrC TRUCKING 14 DRIVERS DUMP TRUCKS_________ 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAtLER/GENER. 1 . DELAYS; TRUCK 62 WAS DELAYED FOR 2,5 HOURS CARGO BOXES 4 OUE TO BRAKE PROBLEMS FLAT TRUCK ~ 1 |PUMP ~ 2 RAINMAKER/GENIE LIFT ’235 MANNED BY TULLY FROM 5PM-12AM

Descriotion ofWoik; COMPLETED WORK ~ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE maintained TRAFFIC FLOW INTO AND OUT OF AREA______________________ ____________________ trucks to pier 6 DELAYED APPROXIMATELY 1 HOUR BY POT AND ConEd WORK ON TUNNEL AND ROAD LOADS OUT; 117 YUKESOUT: 120 ~ - ----------------------------------------------------

GRACE CONTRACTING CORP Appnovad By; BY; 1 iTIUe; For: SUPERIN TEH PEHT 04.028547 DAILY WORK FORCE REPORfoi22Nj<t3

CITY_21MC100_004198418

NYC-WTC_000432575

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000432575Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →