NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 5 pages

ICS 201 summary, 4/27–5/3/02

Machine-extracted title · confidence 43%

ICS 201 summary for 4/27–5/3/02; period and city identifiers.

NYC-WTC_000304519–000304523
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ICS 201 Summary of Current Actions Updated as of 1600,5/3/02 o CENTRAL fVASHSTATION (NORRELL)

The through-put numbers are;

Thursday 4/25/02 - 2975 Friday 4/26/02 - 3397 Saturday 4/27/02 -1841 Sunday 4/28/02- 1714 Monday 4/29/02 - 3094 Tuesday 4/30/02 - 2995 Wednesday 5/01/02 - 4016

As of 5/3/02, the time period for the use of the property is not clear. The Salvation Army will continue food service until otherwise notified and then EPA can initiate breakdown of the tent and infrastructure. The most recent schedules predict a shut down date on or about June 1, 2002. This is based on the current debris removal and site inspection schedule. DDC is developing a demobilization plan that will be available soon. OEM also anticipates that June 1 will be the end of the recovery phase of operations. As always, these schedules are subject to change.

A bid solicitation for the breakdown of the Sprung structure has been put out and two site walks for bidders have been completed. Six firms will bid on the job. Bids are expected by COB May 15, 2002.

o DISPOSAL (TOUW/NORRELL) B-6 Level Emergency Generators - As of 5/03, the third and final emergency generator, located between WTC #1 and 2, is still covered with debris and awaiting asbestos abatement. ERRS will drain the generator once it is cleared from the rubble and the abatement is completed.

Stillwell & Gladding Lab, 130 Cedar Street - Work has been completed. All materials have been packed and are staged for disposal.

Transition Issues Meeting - Coordination of the grid assessment of the site continues. Inspections are expected to begin the week of May 13, 2002, and be completed by June 1,2002. At that time the site will shift into the rebuilding phase.

General Activities - EPA, RST and ERRS continue to recon the site to recover batteries, containers and cylinders as they are uncovered during the on-going recovery effort. Overall, the following materials have been collected to date from the WTC site;

Batteries: 174 Containers; 675* Cylinders; 2954

*NOTE: The large quantity of containers recently recovered from WTC #5 will not be individually inventoried, and is not included in this summary. The majority of those

ICS 201

CITY_21MC1OO_O1111663O

NYC-WTC_000304520

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000304520Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →