NYC 9/11 Public Portal Document
Kelly McKinney - 201may9.wpd Page 2
ICS 201 Summary of Current Actions Updated as of 1600, 5/9/02
o CENTRAL WASH STATION (NORRELL)
The through-put numbers are: Wednesday 5/01/02 -4016 Thursday 5/02/02 - 3058Friday 5/03/02 - 3834Saturday 5/04/02 - 1913Sunday 5/05/02 - 1864Monday 5/07/02 - 2840Tuesday 5/07/02-3063 As of 5/8/02, the time penod for the use of the property remains unclear. I he Salvation Army will continue food service until otherwise notified and then EPA can initiate breakdown of the tent and infrastructure. The most recent schedules predict a shut down date on or about June 3, 2002. This is based on the current debris removal and site inspection schedule. DDC is developing a demobilization plan that will be available soon. OEM also anticipates that early June will be the end of the recovery phase of operations. As always, these schedules are subject to change.
A bid solicitation for the breakdown of the Sprung structure has been put out and two site walks have for bidders have been completed. Six finns will bid on the job. Due date for bids has been extended to COB May 20, 2002, since the completion date for site operations has been pushed into June.
o DISPOSAL
Oil/Water Pump-Outs - On 5/8, EPA pumped out oily water from two locations at the WTC site. The first location was an escalator pit at the former PATH station that was filled with oil and water. The second location was the secondary containment structures for the two 2,500 gallon oil tanks in the B-6 level of Building 6, which EPA had pumped out several weeks ago. At that time, the secondary contaimnent areas were pumped out only to the point of resetting the tanks - which had floated due to flooding - back on their saddles, and the residual water in the containment did not contain a significant quantity of oil to recover under the conditions in the vicinity of the tanks at that time. However, that area is now stabilized, and a vac truck was mobilized to complete the removal of oil and water. ,
In addition, ERRS vac’ed up an estimated 30 to 40 gallons of antifreeze which had spilled from the ventilation system on the B-4 level of Building 6. This material was also collected via vac truck. In total, an estimated 5900 gallons of oil/water and antifreeze were collected by 2 vac trucks between those 3 locations.
B-6 Level Emergency Generators - Sometime during the week of 4/29, the third and final emergency generator, located between WTC #1 and 2, was removed from the site without ERRS being given the opportunity to drain its oil and anti-freeze.
Transition Issues Meeting - On 5/8, EPA attended a follow-up meeting to discuss
ICS 201
CITY_21MC100_002462771
NYC-WTC_000337706
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000337713
ICS 201 covering 5/10–5/16/02 with project activity notes.
19 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337700
ICS 201 cover sheet with period 5/17–5/23/02 and updated status.
17 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454037
Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.
19 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454057
ICS 201 cover sheet; summary for period 5/4–9/02 at NYC-WTC site.
19 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454117
ICS 201 summary for period 5/4–5/9/02, updated 1600.
19 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
19 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454066
ICS 201 summary page for 5/4–9/02 at NYC-WTC site.
19 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455464
ICS 201 period summary for WTC response operations.
19 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302235
ICS 201 summary for 5/17-23/02, NYC-WTC identifiers.
16 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000304524
ICS 201 summary for 5/17–5/23/02; period and city identifiers.
17 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000304515
ICS 201 summary for 4/13–4/19/02; period and city identifiers.
13 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302226
ICS 201 summary for 4/13-19/02, NYC-WTC identifiers.
13 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454066
ICS 201 summary page for 5/4–9/02 at NYC-WTC site.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454057
ICS 201 cover sheet; summary for period 5/4–9/02 at NYC-WTC site.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454117
ICS 201 summary for period 5/4–5/9/02, updated 1600.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454037
Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337713
ICS 201 covering 5/10–5/16/02 with project activity notes.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000454037
Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.
Similar indexed content
NYC-WTC_000454057
ICS 201 cover sheet; summary for period 5/4–9/02 at NYC-WTC site.
Similar indexed content
NYC-WTC_000454117
ICS 201 summary for period 5/4–5/9/02, updated 1600.
Similar indexed content
NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
Similar indexed content
NYC-WTC_000454066
ICS 201 summary page for 5/4–9/02 at NYC-WTC site.
Similar indexed content