NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

ICS 201 summary, NYC-WTC, May 2002

Machine-extracted title · confidence 48%

Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.

NYC-WTC_000454037–000454040
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ICS 201 Summary of Current Actions Updated as of 1600, 5/9/02 0 CENTRAL WASH STATION (NORRELL)

The through-put numbers are:

Wednesday 5/01/02-4016 Thursday 5/02/02 - 3058 Friday 5/03/02 - 3834 Saturday 5/04/02 - 1913 Sunday 5/05/02 - 1864 Monday 5/07/02 - 2840 Tuesday 5/07/02 - 3063

As of 5/8/02, the time period for the use of the property remains unclear. The Salvation Army will continue food service until otherwise notified and then EPA can initiate breakdown of the tent and infrastructure. The most recent schedules predict a shut down date on or about June 3, 2002. This is based on the current debris removal and site inspection schedule. DDC is developing a demobilization plan that will be available soon. OEM also anticipates that early June will be the end of the recovery phase of operations. As always, these schedules are subject to change.

A bid solicitation for the breakdown of the Sprung structure has been put out and two site walks have for bidders have been completed. Six firms will bid on the job. Due date for bids has been extended to COB May 20, 2002, since the completion date for site operations has been pushed into June.

o DISPOSAL

Oil/Water Pump-Outs - On 5/8, EPA pumped out oily water from two locations at the WTC site. The first location was an escalator pit at the former PATH station that was filled with oil and water. The second location was the secondary containment structures for the two 2,500 gallon oil tanks in the B-6 level of Building 6, which EPA had pumped out several weeks ago. At that time, the secondary containment areas were pumped out only to the point of resetting the tanks - which had floated due to flooding - back on their saddles, and the residual water in the containment did not contain a significant quantity of oil to recover under the conditions in the vicinity of the tanks at that time. However, that area is now stabilized, and a vac truck was mobilized to complete the removal of oil and water.

In addition, ERRS vac’ed up an estimated 30 to 40 gallons of antifreeze which had spilled from the ventilation system on the B-4 level of Building 6. This material was also collected via vac truck. In total, an estimated 5900 gallons of oil/water and antifreeze were collected by 2 vac trucks between those 3 locations.

B-6 Level Emergency Generators - Sometime during the week of 4/29, the third and final emergency generator, located between WTC #1 and 2, was removed from the site without ERRS being given the opportunity to drain its oil and anti-freeze.

ICS 201

CITY_21MC100_011282743

NYC-WTC_000454038

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454038Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →