ICS 201 activity summary, May 2002

Machine-extracted title · confidence 34%

ICS 201 period summary for WTC response operations.

NYC-WTC_000455464–000455468
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ICS 201 Summary of Current Actions Updated as of 1600, 5/16/02

o CENTRAL WASH STATION (NORRELL)

The through-put numbers are:

Wednesday 5/08/02 - 3228 Thursday 5/09/02 - 3007 Friday 5/10/02 - 3016 Saturday 5/11/02- 1888 Sunday 5/12/02 - 1325 Monday 5/13/02 - 3203 Tuesday 5/14/02 - 3869

As of 5/15/02, the time period for the use of the property remains unclear. The Salvation Army will continue food service until otherwise notified and then EPA can initiate breakdown of the tent and infrastructure. The most recent schedules predict a shut down date on or about June 2, 2002. This is based on the current debris removal and site inspection schedule. DDC is developing a demobilization plan that will be available soon. OEM also anticipates that early June will be the end of the recovery phase of operations. As always, these schedules are subject to change.

A bid solicitation for the breakdown of the Sprung structure has been put out and two site walks for bidders have been completed. Six firms will bid on the job. Due date for bids has been extended to COB May 22, 2002, since the completion date for site operations has been pushed into June.

0 DISPOSAL (TOUW)

Transition Issues Meeting - On 5/14, EPA attended another follow-up meeting to discuss Environmental, Health and Safety issues that need to be addressed in preparation for the impending transition of the WTC site from FDNY and DDC to the Port Authority. The meeting focused on the actual process that will be followed by the inter-agency team that will be conducting an assessment of the site, to determine the completion of clean-up activities, and to identify any remaining work that needs to be done prior to sign-off by FDNY, DDC and other regulating agencies. The walk-through process did not start on 5/14 as previously anticipated, pending resolution of a few remaining issues.

General Activities - EPA, RST and ERRS continue to recon the site to recover batteries, containers and cylinders as they are uncovered during the on-going recovery effort. Overall, the following materials have been collected to date from the WTC site:

Batteries: 175 Containers: 676 Cylinders: 2984

Of the cylinders, 1713 have been recycled, and 186 have been accepted by four cylinder

ICS 201

CITY_21MC100_006456317

NYC-WTC_000455465

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455465Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →