NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
20 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗ICS 201 period summary for WTC response operations.
NYC-WTC_000455464–000455468OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ICS 201 Summary of Current Actions Updated as of 1600, 5/16/02 companies. In addition, 56 batteries have been recycled, and 6 batteries have been shipped off-site for disposal. Approximately 645,365 gallons of fuel oil and/or oily water mixture have been pumped from basements, manholes, trenches and USTs.
ERRS continues to cut fire extinguishers and recover the powdered contents into drums at the landfill.
T&D - ERRS put out the Invitation for Bids for the disposal of all waste streams, and the subcontract for drummed waste has been awarded. The subcontract for cylinder disposal is expected to be awarded during the week of 5/20.
o USCG WASH GROUP
Coast Guard BOA contractor. Miller Environmental Group, is maintaining (10) operational wash stations. The total includes (2) vehicle and (6) personal wash areas. NSE personnel are conducting 24 HR monitoring of all washing activities. Pier 25 and Greenwich St. truck wash stations are no longer in operation.
Personnel: Church and Vessey (2): 674 People per day Church and Eiberty: 253 People per day Engine 10: 296 People per day (Eiberty and Greenwich)
Vehicle: West and Albany: 705 Vehicles per day West and Vessey: 514 Vehicles per day
Future Plans: NSE personnel continue working with EPA, Bovis, OEM, FDNY and NYPD to arrange wash stations that meet the needs of all agencies.
Personnel: BM2 Schalich - Team Supervisor- Hilton Rm 2520 BM3 Curtis Sheraton Rm 2206 BMl Bittie Sheraton Rm 2209
0 11/6 LOWER MANHATTAN SAMPLING GROUP {JIMENEA, NORRELL, HALE, & & PATEL)
Collection of airborne asbestos samples continued. Two twelve hour samples are taken at each fixed station per day. As of May 15, barge loading of ground zero debris operations at Pier 25, will be discontinued. The sampling group is recommending that once all related loading equipment is removed that all sampling and air monitoring operations at stations R, L, M, N should be discontinued.
VOC samples continued to be taken in the ground zero excavation. Analysis is
ICS 201
CITY_21MC100_006456318
NYC-WTC_000455466
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
20 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454066
ICS 201 summary page for 5/4–9/02 at NYC-WTC site.
20 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454057
ICS 201 cover sheet; summary for period 5/4–9/02 at NYC-WTC site.
20 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454037
Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.
20 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454117
ICS 201 summary for period 5/4–5/9/02, updated 1600.
20 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234809
ICS 201 summary for NYC event; management of incident data; March 15, 2002.
13 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000304515
ICS 201 summary for 4/13–4/19/02; period and city identifiers.
14 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302226
ICS 201 summary for 4/13-19/02, NYC-WTC identifiers.
14 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455328
ICS 201 summary covering the response period from 4/27 to 5/3/02.
12 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337713
ICS 201 covering 5/10–5/16/02 with project activity notes.
20 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000303130
ICS 201 summary for period 3/9–3/15/02, NYC-WTC file CITY_21MC100_009041339.
13 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337729
ICS 201 updated 3/15/02 for period 3/9–3/15/02 at WTC site.
13 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000337713
ICS 201 covering 5/10–5/16/02 with project activity notes.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455328
ICS 201 summary covering the response period from 4/27 to 5/3/02.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000304519
ICS 201 summary for 4/27–5/3/02; period and city identifiers.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000337718
ICS 201 covering 4/27–5/3/02 with periodic activity updates.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302230
ICS 201 summary for 4/27-5/3/02, NYC-WTC identifiers.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454900
ICS 201 form covering period 2/23–3/1/02; actions and resource planning.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000337713
ICS 201 covering 5/10–5/16/02 with project activity notes.
Similar indexed content
NYC-WTC_000454061
ICS 201 cover page details for NYC-WTC project with date references.
Similar indexed content
NYC-WTC_000454066
ICS 201 summary page for 5/4–9/02 at NYC-WTC site.
Similar indexed content
NYC-WTC_000454057
ICS 201 cover sheet; summary for period 5/4–9/02 at NYC-WTC site.
Similar indexed content
NYC-WTC_000454037
Emergency Management ICS 201 summary covering period 5/4–9/02 for WTC operations.
Similar indexed content