NYC 9/11 Public Portal Document
October 8, 2001 (11:21am)
Preliminary Data
New York City/ World Trade Center Sampling Activities
Exchange Place PATH Dewatering
Preliminary Results Summary:
EPA Personnel: Robert Morrell
Warren McHose
Sampling Date: October 03, 2001
Location: Grab samples from direct discharge to the Hudson River.
Sample Matrix: Aqueous
Analytes (Laboratory): VOCs (Region 2)
PCBs (Region 2)
PAHs (Region 2)
Metals (Region 2)
BOD5 (Region 2)
TSS (Region 2)
TOC (Region 2)
Total Petroleum Hydrocarbons (Region 2)
Dioxins/Furans (contract lab - Paradigm Analytical)
Asbestos (contract lab)
Dewatering Activity: The Port Authority initiated pumping from the PATH tunnels at Exchange
Place under an existing permit (NJ0076988) on September 11, 2001. The Port Authority
estimates that discharge averaged 2600 GPM. The F tunnel has been plugged since the WTC
disaster, and no dewatering is occurring from that tunnel. Dewatering continues from the E
tunnel. Pumps are activated by a float switch, and operate between 8 and 12 hours per day, at an
estimated discharge of 250 GPM. NJDEP had been notified of the enhanced discharge, but
performed no sampling. EPA learned of the enhanced discharge on October 01, 2001, and
performed reconnaissance on October 02, NJPDES Permit parameters are tabulated below.
DSN Monthly Long Term Description of
Average Flow, Average Flow, Treatment
GPD (AppI) GPD (DMR)
001 7200 480 None
002 32000 480 None
003 NA NA None
CITY_21MC1OO_OO3113129
NYC-WTC_000304415