NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 36 pages

Draft: environmental monitoring plan for WTC debris

Machine-extracted title · confidence 50%

Draft plan for environmental monitoring of exposure to fibers after WTC collapse.

NYC-WTC_000302886–000302921
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

For the purposes of this project, field blanks will be submitted for air samples and dust samples at a rate of 5% (minimum number = 2). There are no field blanks for soil or dust.

Field replicates of air samples will also collected at a rate of approximately 5%. This will include samples from co-located stationary air monitors, and may also include samples obtained from personal air monitors using a flow splitter, when feasible.

Although filed duplicate samples of debris or dust will be collected from some locations as part of this program, it is important to stress that these will not be evaluated as QC samples, since there are no criteria to judge whether the agreement between samples is within some pre-define acceptance limit. Rather, duplicate samples of these media will be used to gain understanding of the inter-sample variability.

The number of each type of QC and related types of samples to be included in this study is summarized in Table B-2.

B6. INSTRUMENT CALIBRATION and FREQUENCY

Field Instruments

Pumps used for air sampling will be calibrated in accord with SOP ASTM D 3195 -90 prior to sampling and again at the termination of sampling to determine average air flow rates during the sampling. Laboratory Instruments

SOPs will identify requirements needed to be met by the laboratories to meet adequate instrument calibration frequency, and QA/QC for raw data and reports.

B7. DATA MANAGEMENT

Data generated during this project will be managed using the same basic methods and procedures established for Phase 1 (USEPA 2000b). In brief, all data are entered into a project-specific database by appropriately trained data entry staff. The data entered into the database includes all relevant field information regarding each environmental samples collected, as recorded on the Field data Sheets and in the field log book, as well as the analytical results provided by the laboratory. All data entries are reviewed and validated for accuracy by the data entry manager or his/her delegate. All original data records (both hard copy and electronic) will be cataloged and stored in their original form by the Project Director.

CITY_21MC100_009029052

NYC-WTC_000302913

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302913Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →