An overall site environmental S&H assessment was conducted on October 4. 2001 of the
WTC disaster area. The primary focus was to identify any major unsafe practices or
unsafe conditions that pose a threat to search, rescue, demolition personnel, cleanup
worker's, and support personnel on site.
AMEC
_______________ Issues_______________ Location Dispositions
Several employees observed without In front of Winter Reinforce the wearing of PPE by
safety glasses, or respirators in and around Garden area all employees.
debris pile.
Vehicle observed without back-up alarm. Same as above Immediately corrected by turning
on alarm.
Bovis Land Lease
Issues Location Dispositions
General lax on wearing of PPE. All areas Reinforce PPE requirements
T ully^onstruction
_______________ Issues______________ Location _________ Dispositions______
Employees/Supervisor not wanting Liberty and Church Issue being worked bv Bechtel,
employees to have to wear sampling Area ATC, and Tully.
pumps since OSHA is also taking samples
of employees.
Flat bed truck driver wasn’t happy with Liberty and Church Bechtel ES&H worked with Tully
the way his truck was loaded with steel Area and driver to ensure load was
and refused to drive it away until it was secured prior to leaving site.
secured safely. Foreman/Supervisor was
telling him load was safe.
Turner
_______________ Issues___________ Location _________ Dispositions_________
Roof cleaning operation on 1 WFC, Liberty and West Subcontractor to Turner. Building
employees not wearing fall protection. owner contacted and issue
immediately corrected.
Employees, supervisors, and All areas
subcontractors not wearing proper PPE.
Man cage crushed on the top By WFC-1 Immediately taken out of service
by Turner Safety.