NYC-WTC_000388491
Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗Night daily workforce report detailing crews and equipment at World Trade Center.
NYC-WTC_000302427OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ISMS 6tfi Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; WWRY NOVEMBER 24, 2001 NIGHT 8:00 PM
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION uantitI Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 I PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN____________ 2 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 9 TOOL TRUCK 1 MECHANICS 1 TOOL VAN HOUSE WRECKERS 6 ROLL OFF DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 8 1 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TFtAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIEL(DUST SUPR) 1 GENERATOR 1 == Description of Work:____________________________________________ PRELIMINARY WORK_________________________________________ MAN TARPING AND TRIMMING STATIONS MAN WATER STATIONS FOR DUST CONTROL____________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2
GRACE CONTRACTING CORB^ Approved By: Title: ~ BY: For; ~ SUPERiNTENDEtfr^^
CITY_21MC100_010243901
NYC-WTC_000302427
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388491
Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291259
Final daily workforce report with cold, wind conditions, World Trade Center site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429386
Night final daily workforce and equipment listings for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388690
Day preliminary daily workforce and equipment counts for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429395
Day shift daily workforce and equipment details for World Trade site on 1/19/02.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302485
Sunday night preliminary labor/equipment roster for World Trade site, Dec 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302426
Night preliminary daily workforce report for World Trade Center site operations.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429397
Day shift daily workforce and equipment details for World Trade site on 1/20/02.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429690
Daily workforce and equipment details for World Trade Center project, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280049
Daily workforce and equipment listing for World Trade site, November 2001, day shift.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388206
Night shift daily workforce listing for World Trade site, Nov 10, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388491
Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291259
Final daily workforce report with cold, wind conditions, World Trade Center site, Nov 16, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429386
Night final daily workforce and equipment listings for World Trade site, Jan 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388690
Day preliminary daily workforce and equipment counts for World Trade project.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429395
Day shift daily workforce and equipment details for World Trade site on 1/19/02.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302485
Sunday night preliminary labor/equipment roster for World Trade site, Dec 16, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388491
Preliminary daily workforce and equipment at World Trade site, Grace Contracting, Nov 22, 2001.
Similar indexed content
NYC-WTC_000291259
Final daily workforce report with cold, wind conditions, World Trade Center site, Nov 16, 2001.
Similar indexed content
NYC-WTC_000429386
Night final daily workforce and equipment listings for World Trade site, Jan 2002.
Similar indexed content
NYC-WTC_000388690
Day preliminary daily workforce and equipment counts for World Trade project.
Similar indexed content
NYC-WTC_000429395
Day shift daily workforce and equipment details for World Trade site on 1/19/02.
Similar indexed content