NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

WTC Daily Site Evaluation, 10/24/2001

Machine-extracted title · confidence 40%

Daily site safety evaluation noting issues and corrective actions at WTC site.

NYC-WTC_000302128–000302129
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Health WTC Daily Site Evaluation* 10/24/01

Major Issues Location Disposition Status 1 Inadequate scaffolding. Winter garden Issue corrected by Breezes foreman. ND\~ Gas cylinders improperly secured. Winter garden Issue corrected by AMEC safety rep. NEW Lack of fall protection.________________________________________ Between Plaza & WTC 6 Issue corrected by AMEC safety rep. NEW Inconsistent use of proper PPE (e.g., safety glasses, respiratory protection). WTC 1 Discussed with AMEC safety rep.________________________________ OPEN

IS Crack observed in slurry wall. WTC6 Crane was backed off the pads; DDC & structural engineers are inspecting the area to determine the stability of the wall. OPEN

3 Gas cylinders improperly secured and stored. WTC 2 Discussed with Bovis safety rep. NEW Inadequate fall protection, (employees not wearing safety harness). WTC 3 Discussed with Koch superintendent and Bovis safety rep. NEW Inadequate dust suppression. WTC 2 Bovis Safety is working with FDNY to conect. Conditions have improved. OPEN Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory WTC2 Met with Bovis safety rep. to discuss conective action plan. OPEN '1 protection). Inadequate barricading. WTC 2 South side Discussed with Bovis safety rep. OPEN

I Discovery of ammunition on pile.

Inadequate vehicle spotting. Southeast comer of WTC 6

WTC 2 & 4 Discussed with Tully safety rep., NYPD (Capt. Motte), and Customs agent (Victoria Ovis). Tully will not cut in that area but will use grappler as directed by NYPD & Customs (Ordinance experts). Discussed with Tully safety rep. OPEN

OPEN

I: Truck made sharp turn and hit Tully gator that had FDNY sitting in it. Lack of flash arrestors on cutting torches. Gas cylinders improperly stored. Inconsistent use of proper PPE (e.g., safety glasses, respirators). O’ Inadequate dust suppression. Liberty Various locations Various locations All areas Tully safety rep informed and incident report requested by Bechtlel Safety. Tully ordered flash arrestors and will place them on torch once they come in._________________________________________________________ Conttactor’s safety rep. was informed. Discussed with contractor’s safety personnel. OPEN OPEN OPEN OPEN Tully Discussed with Tully safety rep. Conditions have improved. OPEN

Received demo, plan for 30 W. Broadway. WTC 7 Bechtel safety is reviewing. NEW

a sa Inadequate fall protection. Backup alarm not loud enough on CAT front end loader 960F. WTC 7 (stacked Conex boxes) WTC 7 Discussed with Seasons safety rep. Discussed with Seasons safety rep. OPEN OPEN Inadequate barriers by tube trailer. WTC 7 Turner Safety rep is working w/FDNY to correct. OPEN No backup alarm on Seasons dump truck #38. (NJAF179H) WTC 7 Discussed with Seasons safety rep.__________________________ OPEN Various location.s Turner ordered flash arrestors and installed. 1 burner removed flash Lack of flash arrestors on cutting torches. OPEN •'M Diesel fuel tanks not grounded or posted. Gas cylinders improperly secured and stored. Barclay St. WTC 7 arrestor. Discussed with Turner safety rep.___________________ Electrical cords were discovered to be cut. Met with Seasons safety rep. to discuss corrective action plan. OPEN OPEN Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 Mel with Seasons safety rep. to discuss conective action plan. OPEN O

I to

o O o I o o to

co *Sitc assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions.

[.J

NYC-WTC_000302128

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302128Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

11 shared non-person entities · 1 shared topics · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000337372

Daily evaluation with items on gas cylinders, scaffolding, fall protection and PPE, open/Open status.

Similar indexed content

NYC-WTC_000337370

Daily site evaluation entries noting PPE and fall protection issues and corrective actions.

Similar indexed content

NYC-WTC_000387709

Daily safety evaluation noting equipment, fall protection, and PPE issues at WTC site.

Similar indexed content

NYC-WTC_000302572

Safety evaluation noting scaffolding and hazard corrections.

Similar indexed content

Compare copies and versions →