NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 34 pages

Guidance for Environments, NYC WTC

Machine-extracted title · confidence 35%

Guidance document related to environmental health at World Trade Center site.

NYC-WTC_000291428–000291461
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Protection from Chemical. Biological, or Radiologic^ /^tacks 19

building. These modifications may be more feasible for new building construction or those undergoing major renovation.

4. Low-leakage, fast-acting dampers. Rapid response, such as shutting down an HVAC system, may also involve closing var­ ious dampers, especially those controlling the flow of outdoor air (in the event of an exterior CBR release). When the HVAC system is turned off, the building pressure compared to out­ doors may still be negative, drawing outdoor air into the build­ ing via many leakage pathways, including the HVAC system. Consideration should be given to installing low leakage dampers to minimize this flow pathway. Damper leakage rat­ ings are available as part of the manufacturer’s specifications and range from ultra-low to normal categories. Assuming that you have some warning prior to a direct CBR release, the speed with which these dampers respond to a "close" instruc­ tion can also be important. From a protective standpoint, dampers that respond quickly are preferred over dampers that might take 30 seconds or more to respond.

5. Building air tightness. Significant quantities of air can enter a building by means of infiltration through unintentional leakage paths in the building envelope. Such leakage is of more concern for an exterior CBR release at some distance from a building, such as a large-scale attack, than for a direct­ ed terrorist act. The reduction of air leakage is a matter of tight building construction in combination with building pres­ surization. While building pressurization may be a valuable CBR-protection strategy in any building, it is much more like­ ly to be effective in a tight building. However, to be effective, filtration of building supply air must be appropriate for the CBR agent introduced. Although increasing the air tightness of an existing building can be more challenging than during new construction, it should still be seriously considered.

s

CITY_21MC100_011104390

NYC-WTC_000291454

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291454Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

Compare copies and versions →