Guidance for Environments, NYC WTC

Machine-extracted title · confidence 35%

Guidance document related to environmental health at World Trade Center site.

NYC-WTC_000291428–000291461
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Protection from Chemical, Biological, or Radiological Attacks 15

could be less strict than to hospital laboratories, and succes­ sively more strict for other areas, such as ventilation control rooms. Physical security is of prime concern in lobby areas.

Ventilation and Filtration HVAC systems and their components should be evaluated with respect to how they impact vulnerability to the introduction of CBR agents. Relevant issues include the HVAC system controls, the abil­ ity of the HVAC system to purge the building, the efficiency of installed filters, the capacity of the system relative to potential filter upgrades, and the significance of uncontrolled leakage into the building. Another consideration is the vulnerability of the HVAC system and components themselves, particularly when the facility is open to the public. For buildings under secure access, interior com­ ponents may be considered less vulnerable, depending upon the per­ ceived threat and the confidence in the level of security.

***1. Evaluate HVAC control options. Many central HVAC sys­ tems have energy management and control systems that can regulate airflow and pressures within a building on an emer­ gency response basis. Some modern fire alarm systems may also provide useful capabilities during CBR events. In some cases, the best response option (given sufficient warning) might be to shut off the building’s HVAC and exhaust sys- tem(s), thus, avoiding the introduction of a CBR agent from outside. In other cases, interior pressure and airflow control may prevent the spread of a CBR agent released in the build ing and/or ensure the safety of egress pathways. The decision to install emergency HVAC control options should be made in consultation with a qualified HVAC professional that under­ stands the ramifications of various HVAC operating modes on building operation and safety systems.

CITY_21MC100_011104386

NYC-WTC_000291450

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291450Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

Compare copies and versions →