NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce and equipment for World Trade Center, Feb 3, 2002.
NYC-WTC_000291340OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6lh Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/3/02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions:
Labor Il Equipment CLASSIFICATION QUANT. Il Description MANNED STANDBY! IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER i OFFICE ENGINEER ■ CAT 375 GRAPPLER 1 1 FOREMEN 2 ' HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 6 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 EUKES 4 MECHANICS 1 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 ‘COMPRESSOR RAN DURING SHIFT UNMANNED* DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2
—
Description of Work:_____________________________________________________________________ COMPLETED WORK___________________________________________________________________ CONTINUED TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORDED TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 101 YOKES: 168 DOT LOADS: 93_________________________________________________________________________________ DELAYS: RECOVERY IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS', 1200 LOST 1HR 0200-0300
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0203N.xls
CITY_21MC100_004972756
NYC-WTC_000291340
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342322
Night shift daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305121
Daily labor/equipment summary for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263646
Daily labor/equipment report for World Trade Center construction (1/29/02).
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291356
Night shift workforce and equipment at World Trade Center, Dec 12, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252305
Night shift daily workforce and equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429466
Night final daily workforce and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305191
Day preliminary staffing for World Trade, Feb 2, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similar indexed content
NYC-WTC_000342322
Night shift daily workforce and equipment at World Trade site, January 2002.
Similar indexed content
NYC-WTC_000305121
Daily labor/equipment summary for World Trade Center site.
Similar indexed content
NYC-WTC_000263646
Daily labor/equipment report for World Trade Center construction (1/29/02).
Similar indexed content
NYC-WTC_000291356
Night shift workforce and equipment at World Trade Center, Dec 12, 2001.
Similar indexed content