NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

breaks. Construction began 4/23/01. 5/24/01: Building construction underway . Stormwater plan 85% complete. Temporary erosion control measures in place. 6/18/01 and 7/23/01: Building construction complete. Stormwater plan 100% complete. Final site stabilization and paving remains. SEQRA - DEP Lead Agency, Unlisted Activity; Neg Dec on 7/14/00.

Town: Fleischmanns (V) Drainage Basin: Pepacton Reservoir Project Name: Fleischmanns Proposed WWTP, (Log #3616) Project Description: Proposed WWTP; MOA Program 122 Area # 2 Status: 1/29/99 Status: Project is deadlocked in Task 2 due to a disagreement on service area boundaries. Task 2 completed and approved with a final flow allocation of 145,000 gpd. Task approved. Task 4 ongoing. Task 4 Discussion Draft comments completed 12/23/99 and DEP considers the report and Task 4 incomplete. Major issues are as follows: SBR vs. RBC comparison not adequate, expand design comparisons to include RBC’s in unit operations and sizing calculations, no detailed collection system evaluation, and no supporting backup data available for adequately assessing the preliminary cost estimate. Final Task 4 Report comment; received 3/01/00. DEP held a conference call with Engineer to finalize comments on 3/23/00. Comments received on 4/6/00. On 6/6/00 the DEIS was received from Engineer. Public Hearing was held on 6/28/00 for the DEIS and comments are due by 7/7/00 to the Lead Agenc; Facility plan for Task 6 was received on 6/28/00 which are under review. DEIS review comments submitted to Town on l/l/OQ. Sewer rate structure received from Engineer on 7/20/00 for review. Facility Plan for Task 6 was received on 6/28/00 and review comments were issued on 8/14/00. User charge system received from Engineer on 7/20/00 and comment issued 8/14/00. Task 6 - Comment Response dated 9/13/00 was received and accepted on 9/20/00. Signed design/construction amendment on 8/13/01. SEQRA - Lead Agency V/Fleischmanns; Positive Declaration, DEIS to be done at future date.

Town: Franklin Drainage Basin: Cannonsville Project Name: Loturco Runway, (Log #8814) Project Description: Proposal to create a grass covered personal runway approx. 2100 feet, a residential home and freshwater pond. Approx 9 Acres Disturbed. Status: DEP received the SPPP on 8/13/99 for this ongoing private runway and residential constructi project. The submitted materials are currently under review. DEP issued a NICA on 9/2/99 after reviewing the SPPP dated 8/13/99, for this previously cleared private runway and residential lot development site. Additional information was requested on pond and culvert sizing and design, runoff calculations, and pollutant removal efficiencies. On 7/31/01, DEP conducted a site inspection of the runway project and met with the applicant to explain what information is needed from his engineer to make the SPPP application complete. The site inspection revealed that the grass cover on the previously disturbed areas was sparse. In addition, the drainage structures did not appear to be properly sized or designed. The propos SSTS area was also inspected, however, no soils tests were completed during the site visit. C 8/16/01, DEP issued a letter to the applicant stating that revised plans and documentation me be submitted to DEP to make his SPPP application complete. In addition, written justificatic will be required from the engineer for any completed components of the project that will not addressed in the SPPP, and to support the claim that portions of the SPPP Applicant’s Guide not apply to this activity. The letter advised that if no reply is received by 10/16/01, the SPP application will be considered abandoned.

32 NYC-WTC_000291058

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291058Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →