NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Project proposal, World Trade Center Recovery

Machine-extracted title · confidence 31%

Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.

NYC-WTC_000290803–000290805
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Proposal Date: May 7,2002______________ JCC CONSTRUCTION CORP T 0: BO VIS'AMEC ALLIANCE 24-02 39TH AVENUE 2^ VESSEY ST.- 30TH FLOOR LONG ISLAND CIPf, NY 11101 City, State, Zip; NEW YORK, NY 10009 PHONE; (718)482-9600 Attention; MR. LEONARD 3A.R0NE-PR0J. M FAX:(718)482-16]6 Project name; WORLD TRADE CENTER RECOVERY We propose to furnish all material and perform all labor necessary to complete the following;

1. Remove and replace sand in playground area.

2. Remove and replace sand in volleyball court area.

3 Remove top 6" of soil in bocce coun area.

4 Replace damaged railing along pier 25. Remove and replace all wood top handrails, power wash entire railipg and replace

danicgc curb as needed.

5 Excavate and remove Icrnporary asphalt roadway. Excivilc and remove all gravel under temporary roadway. Excavate and and remove of soil beneath gravel to elevation equal to bottom of the adjacent parang stone (between N. Moore St & School).

6. Remove debn's, patch as needed bike path. Paint lines as required to match tire existing bike path

’ Elirrunare all power washing

ALTERNATES

I' I,) Adjust utility frame and cover total 11 @$ 4,000.00 ea.

2.) Water for dust control not included.

J.) Asphalt restoration or patching not included.

d. j Payment and Performance bond is not included in the base bid price.

We propose to furnish material and labor, complete in accordance with above specifications, for (he I sum of: Three Hundred Ninety Seven Thousand two Hundred Dollars & No Cents (5397,200.00) ■f

Payments to be made as follows:

ConQ'actor's signature: David Cannizzaro/President I! Acceptance of proposal - The above price, specifications and conditions are satisfactory and are hereby accepted. You are authamred to do the work as specified Payment will be made as il li outlined above.

Owatds signature Date-

CITY_2 IMCl 0 0_Ci 01672089 NYC-WTC_000290803

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290803Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251944

Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).

Similar indexed content

Compare copies and versions →