NYC-WTC_000302475
Final daily labor and equipment roster for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Daytime daily workforce at World Trade site, Dec 18 2001.
NYC-WTC_000290108OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-»5 Bth Road. Whitestone. N.Y. 11357-(718) 787-9000 DATE: DECEMBER 18,2001 (DAY) FINAL DAILY WORK FORCE REPORT
lob Name & Location: World Trade Center
Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 'foremen 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER 1 LABORERS 23 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 6 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK HOUSE WRECKERS 7 ■ TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS ■ LOW BED TRAILER lELIVERIES: AWISCO ■ HIGH DECK TRAILERS AUSTER RUBBER WELDING TRUCK 1 BLACK BEAR FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS PICKUP TRUCKS B LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS •NOTE* 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1
i ICARGO BOXES FLAT TRUCK PUMP ROLLER 4
2 1
1 LIGHT TOWERS USED FOR 3 HOURS RAINMAKER/GENIE LIFT 1
Description of Work: J DELAYS: 12:30- 2:15 OUT OF HOLE FOR PULLING OF BUILDING «6____________________________ DELAYS: HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 & 2_________________ MANNED TARPING AND TRIMMING STATIONS______________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL_______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY
GRAC^CONTRACTING CORP ■oproved By:
W ■ SUPERIF
DAILY WORK FORCE REPORT 1218D.xls
CITY_21MC100_004715098
NYC-WTC_000290108
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302475
Final daily labor and equipment roster for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302512
Day final daily workforce report for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266917
Day shift daily workforce report for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388395
Day shift daily workforce report for World Trade site with equipment and personnel counts.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291307
Daytime daily workforce summary for World Trade Center project; includes equipment list.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388446
Final daily workforce report for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302403
Day workforce and equipment report for World Trade Center, December 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305220
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302479
Day final daily labor/equipment roster for World Trade site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000302475
Final daily labor and equipment roster for World Trade site, Dec 19, 2001.
Similar indexed content
NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000302512
Day final daily workforce report for World Trade Center project.
Similar indexed content
NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.