NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Pre-bid meeting notice, 114 Liberty Street WTC-LBA, 2003

Machine-extracted title · confidence 37%

NYC DEP pre-bid conference for 114 Liberty Street WTC LBA scope and walk-through.

NYC-WTC_000282486
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document JUL. !C. vLV ' "i “ i C in ; - L !«V. V** J z New York City Department of Environmental Protection Bureau of Environmental Compliance

WTC Unoccupied Building Cleaning Program 114 Liberty Street Scope of Work Project #WTC-LBA

A MANDATORY PRE-BID meeting is scheduled for February 18, 2003 at 10:00 A.M. at 114 Liberty Street, Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.

Background

A follow-up visit to 114 Liberty Street revealed minor dust accumulations present on surfaces within the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.

CUIBOi ■ J The Monitoring Contractor shall provide personnel experienced, tiained, and certified in environmentaFsampling and asbestos air monitoring to be nn.site fiill-time Hurinp'wnrkjireajarepaiatlnn and cleaning phases qFbuilding intt^rior.*! (12 stories -5.000 to 6,000 Square feet per floor). Each apartment occupies an entire floor with the exception of the top floor that is a duplex and the apartment on the third floor that shares the floor with two commercial spaces. The entire interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this work. Each floor has central HVAC systems.

The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring and sampling, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoriae Cnntractor shall provide clearance sampling and analyses

The Monitoring Contractor shall provide qualified staff to collect samples for asbestos, lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, and crystalline silica.

An accredited laboratory shall perform all sample analyses,

Contract Term

The Work shall be performed 24 hours per day, seven (7) days per week Pre-clean up aamplinp mint hngin jijfhin p/i rapqint of the Wfwk ipnp.f All pre-clean up samples must be completed and submitted to the laboratory for analysis within 48 hours. This contract shall be in force for 90 consecutive calendar days from the DEP commencement date. However, work must be completed within three (3) weeks of the commencement date. Post clean un sampling shall faapin within 4 hours of snrjie.^afiil visual inapartinn and gh*ll h**. cnmpletftd witlyp 2 da^.

I of? 2/7ZO3

CITY_DEP_WORBY_CANNATA_SUBP_000005826

NYC-WTC_000282486

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000282486Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →