15 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗E-mails 2003 M. Gilsenan
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000162919–000162931
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
New York City Department of Environmental Protection Bureau of Environmental Compliance
WTC Unoccupied Building Cleaning Program 114 Liberty Street Scope of Work Project #WTC-LBA
A MANDATORY PRE-BID meeting is scheduled for February 18, 2003 at 10:00 A.M. at 114 Liberty Street, Building Lobby, New York, N.Y. This conference will include a walk through of the entire building.
Background
A follow-up visit to 114 Liberty Street revealed minor dust accumulations present on surfaces within the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories —5,000 to 6,000 square feet per floor). Each apartment occupies an entire floor with the exception of the top floor that is a duplex and the apartment on the third floor that shares the floor with two commercial spaces. The entire interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this work. Each floor has central HVAC systems.
The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring and sampling, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for asbestos, lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, and crystalline silica.
An accredited laboratory shall perform all sample analyses.
Contract Term
The Work shall be performed 24 hours per day, seven (7) d ays per week. Pre-clean up sampling must begin within 24 hours of receipt of the Commence Work letter. All pre-clean up samples must be completed and submitted to the laboratory for analysis within 48 hours. T 1is contract shall be in force for 90 consecutive calendar days from the DEP commencement date. However, work must be completed within three (3) weeks of the commencement date. Post clean up sampling shall begin within 4 hours of successful visual inspection and shall be completed within 2 days.
I of7 2/7/03
NYC-WTC 000162925
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162906
Document tracking the chain of custody for environmental monitoring samples at 114 Liberty Street on February 7, 2003.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
15 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155174
Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
15 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155635
Submission of contract changes to scope documents awaiting final approval and bidder lists.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155617
Distribution of revised draft scopes of work documents for the 114 Liberty Street project.
15 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155422
Distribution of updated monitoring specifications and related documents for the 114 Liberty Street project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 3 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096696
Memo inviting contractors to bid on a cleaning contract at 125 Liberty Street following the WTC collapse.
Cited alongside this record in an Ask answer
NYC-WTC_000097091
Technical specifications detail mold remediation and special handling instructions for specific items in 125 Cedar Street units.
Cited alongside this record in an Ask answer
NYC-WTC_000097094
Technical specifications detail mold remediation and special handling instructions for specific items in 125 Cedar Street units.
Cited alongside this record in an Ask answer
NYC-WTC_000097097
Technical specifications detail mold remediation and special handling instructions for specific items in 125 Cedar Street units.
Cited alongside this record in an Ask answer
NYC-WTC_000107838
Document excerpt detailing work specifications for asbestos cleanup activities at 125 [name].
Cited alongside this record in an Ask answer