NYC-WTC_000432575
Night final daily workforce and equipment at World Trade Center, January 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Night final daily workforce and equipment at World Trade, Jan 22, 2002.
NYC-WTC_000280832OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 sr Rjod. WZNlBMWia. N Y. 11357. (719)/BT-SCOO DATE: 1/22/02 night FINAL
DAILY WORK FORCE REPORT
lob Nam® & Location: World Trade Conter ICorrtrad No. Iweat/ier Conditions_____________________
|] Equipment ——a DescrIpnon CLASSIFICATION QUANT. II MANNED 'STANDav IDLE SUPERINTENDENT ICAT 966 LOADER 1 PROJECT ENGINEER 1 CiAT 973 LOADER 1 OFFICE ENGINEER CAT 335 GRAPPLER 1 iIfqremen 1 CAT 375 GRAPPLER 1 IISAFETY OFFICER ICAT 375 GRAPPLER 1 LASORERS_______ 9 {HITACHI 750 GRAPPLER ' 1 IRON WORKERS______ HITACHI S50 GRAPPLER 1 LOCAL 14_____________ [HITACH11200 GRAPPLER~ 1 {laSCFM COMPRESSOR 1 LOCAL 15 6 CARPENTER 1235 HAMMER HOE RAM •manned BY TULLY CARPENTER FOREMAN [mechanics TRUCK ~ 1 1 TEAMSTERS (FUEL) 1 P-POL TRUCK MECHANICS 1 {tool VAN HOUSE WRECKERS 2 ROLLOFF {dump TRAILERS ~ a YUKES 4 HIGH DECK TRAILERS 2 WELDING TRUCK_________ DELIVERIES: FUEL TRUCK 1 PICKUP TRUCKS 3 UGHT TOWERS__________ S SITE MULE 2 •NOTE: WTC TRUCKING 14 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER 1 . DELAYS: TRUCK 62 WAS DELAYED FOR 2.5 HOURS CARGO BOXES___________ 4 DUE TO BRAKE PROBLEMS RAT TRUCK____________ 1 PUMP___________________ 2 RAINMAKER/GENIE LIFT ■ •235 MANNED BY TULLY FROM 5PM-12AM
----- Descriolion of Work: COMPLETED WORK - - Il — II 3 CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE MAINTANED TRAFFIC FLOW INTO AND OUT OF AREA TRUCKS TO PIER 8 DEIAYED APPROXIMATELY 1 HOUR BY POT AND ConEd WORK ON TUNNEL ANO ROAD LOADS OUT: 117 ~ --- -------------------------------------------------- YUKES OUT; 120 --------------------------------------------------------------
GRACE CONTRACTING CORP Approvad By; BY; Title: For: SUPERIN TENOERT
D/VLY WORK FORCE REPORTOIZZNJds
CITY_21MC100_003918705
NYC-WTC_000280832
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000432575
Night final daily workforce and equipment at World Trade Center, January 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419155
Night final daily workforce at World Trade Center site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389542
Night final daily labor/equipment roster for World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280848
Night shift daily workforce report with weather notes and equipment for World Trade Center, Feb 2002.
1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305065
Daily workforce and equipment assignments for World Trade Center job, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290071
Night preliminary daily workforce and equipment for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432571
Daily workforce and equipment for World Trade Center project, January 20, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356729
Final daily workforce and equipment at World Trade Center, Dec 5, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388424
Night preliminary daily workforce and equipment for World Trade, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291366
Day shift workforce and equipment at World Trade Center, Dec 13, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305494
Night final daily workforce and equipment list for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342281
Daily workforce report listing labor and equipment for World Trade Center work.
1 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000432575
Night final daily workforce and equipment at World Trade Center, January 23, 2002.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419155
Night final daily workforce at World Trade Center site, Jan 22, 2002.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389542
Night final daily labor/equipment roster for World Trade site, Jan 22, 2002.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280848
Night shift daily workforce report with weather notes and equipment for World Trade Center, Feb 2002.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305065
Daily workforce and equipment assignments for World Trade Center job, Feb 2002.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290071
Night preliminary daily workforce and equipment for World Trade Center project.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000432575
Night final daily workforce and equipment at World Trade Center, January 23, 2002.
Similar indexed content
NYC-WTC_000419155
Night final daily workforce at World Trade Center site, Jan 22, 2002.
Similar indexed content
NYC-WTC_000389542
Night final daily labor/equipment roster for World Trade site, Jan 22, 2002.
Similar indexed content
NYC-WTC_000280848
Night shift daily workforce report with weather notes and equipment for World Trade Center, Feb 2002.
Similar indexed content
NYC-WTC_000305065
Daily workforce and equipment assignments for World Trade Center job, Feb 2002.
Similar indexed content